Difference between revisions of "Hackspace Move/TODO"
Jump to navigation
Jump to search
Line 45: | Line 45: | ||
* <s>Filler walls</s> | * <s>Filler walls</s> | ||
− | * Sand walls | + | * Sand walls - Thursday |
− | * Paint walls | + | * Paint walls - Thursday |
* <s>Paint metal shop floor</s> | * <s>Paint metal shop floor</s> | ||
− | * Clad miniworkshop walls | + | * Clad miniworkshop walls - Friday |
− | * Put up power/network trunking | + | * Put up power/network trunking - Friday |
− | * Place tools | + | * Place tools - Saturday |
− | * Place sockets/run cable | + | * Place sockets/run cable - Saturday/Sunday |
* Run extraction to tools | * Run extraction to tools | ||
* Automate filtration | * Automate filtration |
Revision as of 22:30, 10 April 2013
Pre Move
All this stuff needs to be done before we can officially open
Ground Floor
Classroom
- fit power and network sockets in the new walls
- finish new walls.
lift and fix broken bits of floorwill probably need the shelving removed
- finish a few trunking bits
- fit access point to ceiling
- paint walls:
- what colour? plain matt white?
Lobby
- fix doorbell
Elsewhere
- more network sockets
- more power sockets
- clean under windows. - 1/4 done
quiet room
- run network to basement
- fit access point.
- move shelves
- paint walls? (they are a bit manky atm)
Back door area
fix doorlock (please!).- finish some trunking bits.
- finish boxing in doorbot.
Basement
Workshop
Filler walls- Sand walls - Thursday
- Paint walls - Thursday
Paint metal shop floor- Clad miniworkshop walls - Friday
- Put up power/network trunking - Friday
- Place tools - Saturday
- Place sockets/run cable - Saturday/Sunday
- Run extraction to tools
- Automate filtration
- Run plumbing to workshop sink/biolab
biohacker room
- power sockets
internets
fttcconfig an access pointtest itclone config to other ap's- mount access points tidly
Post Move
This is a list of things that arn't vital to the space function but need to get done
Ground floor
Classroom
- Fit projector screen
- Fit projector
- Led board
elsewhere
- lasercutter
Lobby Area
- signage
basement
- Led board
Internets
- fit and fix the bandwidth meter
- spacefed
- v6 tunnel (?)
- A&A v6
- bufferbloat kernel and tuning
- bandwidth management of some kind.