* Go through member boxes separating out boxes that are full of general equipment and do not belong to members, placing them on separate shelves that are clearly marked | * Go through member boxes separating out boxes that are full of general equipment and do not belong to members, placing them on separate shelves that are clearly marked | ||
* Take up the remainder of the wooden floor downstairs | * Take up the remainder of the wooden floor downstairs | ||
+ | * Collect all the rubbish in the car-park and put it in the bin | ||
+ | * Move the bins to the far end of the car park | ||
+ | * Clear the rubbish that has been shoved down the side of the wall in the car park (next to the front door) | ||
+ | * Replace the bulbs in the car-park floodlights | ||
== Ground Floor == | == Ground Floor == |
Revision as of 14:27, 22 April 2013
Simple tasks that you can do right now
- Clean under the windows
- Clean windows in
- The quiet room
- The main area
- The classroom
- Fit the projector screen on the far classroom wall (opposite the door)
- Fit the skirting board in the quiet room
- Tidy the quiet room into a quiet room rather than a bomb site
- Move books from the back room next to the back door to the bookshelves
- Move electronics gear from the back room to the electronics area
- Fix lightbulbs in all the toilets
- Clean the kitchen
- Assemble all tables in the main room, and put them to one side, or in desk clusters
- Empty the storage room next to the downstairs fire exit
- Collect the downstairs wood-pile into one place out of the way
- Go through member boxes separating out boxes that are full of general equipment and do not belong to members, placing them on separate shelves that are clearly marked
- Take up the remainder of the wooden floor downstairs
- Collect all the rubbish in the car-park and put it in the bin
- Move the bins to the far end of the car park
- Clear the rubbish that has been shoved down the side of the wall in the car park (next to the front door)
- Replace the bulbs in the car-park floodlights
Ground Floor
Classroom
- fit
powerandnetwork socketsin the new walls. Network sockets done and gigabit certified. - finish new walls.
lift and fix broken bits of floorwill probably need the shelving removed
- finish a few trunking bits
- fit skirting board
fit access point to ceiling - needs to wait for paint to drypaint walls - almost done!- fit doors
Lobby
fix doorbelldone!- wire up a doorbot and the doorbell and bellpush etc.
Elsewhere
- more network sockets
- more power sockets
- clean under windows. - 1/4 done
quiet room
- run network to basement
fit access point.move shelves- paint walls
- clean windows
replace damaged flooring- need to re-attach skirting board.
Back door area
fix doorlock (please!).- finish some trunking bits.
- finish boxing in doorbot.
Basement
Workshop
Filler wallsPaint metal shop floorSand walls - ThursdayPaint walls - ThursdayClad miniworkshop walls - FridayPut up power/network trunking - Friday- Place tools - Saturday
Place sockets/run cable - Saturday/Sunday- Run extraction to tools
- Automate filtration
- Run plumbing to workshop sink/biolab
biohacker room
- power sockets
internets
fttcconfig an access pointtest itclone config to other ap's- mount access points tidly
Post Move
This is a list of things that arn't vital to the space function but need to get done
Ground floor
- LOTS OF TIDYING
- Install a hood over the roller shutter door so there's no gap to the outside at the top when closed
Classroom
- Fit projector screen
- Fit projector
- Led board
Scrub paint from floors
elsewhere
- lasercutter
Lobby Area
- signage
basement
- Led board
car park
- We need an ashtray for the yard
Internets
- fit and fix the bandwidth meter
- spacefed
- v6 tunnel (?)
- A&A v6
- bufferbloat kernel and tuning
- bandwidth management of some kind.