Hackspace Move/TODO
Jump to navigation
Jump to search
ground floor
class room
- fit power and network sockets in the new walls
- finish new walls.
lift and fix broken bits of floorwill probably need the shelving removed
- finish a few trunking bits
- fit access point to ceiling
- paint walls:
- what colour? plain matt white?
elsewhere
- more network sockets
- more power sockets
- clean under windows. - 1/4 done
quiet room
- run network to basement
- fit access point.
- move shelves
- paint walls? (they are a bit manky atm)
back door area
fix doorlock (please!).- finish some trunking bits.
- finish boxing in doorbot.
basement
- Filler walls
- Sand walls
- Paint walls
- Paint metal shop floor
- Clad miniworkshop walls
- Put up power/network trunking
- Place tools
- Place sockets/run cable
- Run extraction to tools
- Automate filtration
- Run plumbing to workshop sink/biolab
biohacker room
- power sockets? (not critical? - but they will need a fridge from day one?).
internets
fttc- config an access point
- test it
- clone config to other ap's