447 Hackney Road/Improvements

From London Hackspace Wiki
< 447 Hackney Road
Revision as of 14:10, 8 October 2014 by JasperWallace (talk | contribs) (formatting)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

We're always looking for people to help out making the fabric of the space more awesome. This is the list of the things which need doing and people who are doing them.

Top Priority

Things to do

  • Refurbish toilets: wyan, TimR, jonty
  • Fix main power feed in electrical room.
  • Repaint the ground floor
  • Ground floor ethernet
  • Power runs to the social area: paddy
  • Reorganise the ground floor layout to make more room: jonty
  • Knock the kitchen through + fit new kitchen

Fix faults that have developed

See: 447_Hackney_Road/Faults