Equipment/Stratasys FDM 1650

From London Hackspace Wiki
< Equipment
Revision as of 13:37, 10 June 2015 by Jneves (talk | contribs) (Fixed name of 3d printer)
Jump to navigation Jump to search
Stratasys 3D printer
Stratasys.jpg
Sub-category CNC
Status Under construction
Consumables Printer filament
Training requirement Yes
Training link #Training & instruction
ACnode Yes
Owner LHS
Origin Donation
Location 3D printer area, Ground floor
Maintainers Hipster

Description

The Stratasys is a commercial-grade 3D printer that was donated to the LHS by Imperial College London. It was repaired for a time, but is currently undergoing an extensive refurbishment to bring the electronics up to modern standards and properly convert it to non-vendor-specific feedstock.

Pictures

What it could look like, one day.
The control panel for the Stratasys.
A side view of the Stratasys.

Specification & documentation

  • Usable Print Area: 270mm x 270mm x 300mm
  • Top Print Speed: 20mm/sec (Yes its slow)
  • Print Tolerance: 0.05mm in X and Y axes. Z axis is dependent on layer thickness
  • Layer Thickness: 0.05mm to 0.2mm
  • Supported Materials: ABS and PLA plastic filaments
  • Usable Filament Sizes: standard 1.75mm


Training & instruction

Training IS REQUIRED and is being carried out voluntarily by the current maintainers, more info on the separate training page

Please do not use the printer if you have not been trained, even if you think you know how to use it.

Consumables

Only filament provided by the maintainers can be used in the Stratasys. This is to prevent any issues with poor quality filament. If we're running low on filament (or tape), ro recommended alternative providers, let them know (via the mailing list).

Filament options (3.0mm)

  • ABS (lego brick plastic - prints at 190-230 DegC, requires heated bed at 100-110 DegC)
  • PLA (biodegradable , based on food starch - prints at 185-190 DegC, optional heated bed, not hotter than 60 DegC)
  • There are other 'specialist' filament, like wood effect, stone effect, nylon (can be coloured by clothes dye), etc

3D printing process

3D Print process.png

Log

Original use

For pre-refurbishment logs, see the legacy sub-page here: Stratasys_FDM_1650/Legacy#Logs

Refurbishment

TODO

  • 1. Remove all the unnecessary wiring, including the old heater tubes. 16-05-2013
  • 2. Identify the wiring on the steppers (these are wired differently to normal). 16-05-2013
  • 3. Connect the motors to the 4pi (http://wiki.arcol.hu/blog:4pi) and calibrate the settings.
  • 4. Redesign the head end for 2 hot-ends and extruders.
  • 5. Connected hot ends and run heat and thermistor checks.
  • 6. Head end redesign complete, waiting for aluminium part for mounting hot-ends
  • 7. Filament path checks.
  • 8. Install Raspberry Pi with Octoprint and touch-screen.
  • 9. Dual head calibration test print.
  • 10. Heated chamber (required for ABS), phase 2.

Updates

1-6-2014

After providing spare hands to tgreer in trying to get the new controller wired in for the open-day, I noticed both motor connector plastics are extremely perished. Sockets and plugs. The Y-axis (?) stepper connector has previously been bodged. Pins no longer make good electrical contact with bodged SIL connector. This is both due to bent pins that have apparently been forced, but also the SIL socket terminals sliding freely in their plastics. Pins on stepper are also able to move into the motor body when pressed! Attempting to press another connector onto them will likely push them all the way into the motor housing, rendering the motor useless. As the motor pins still pass continuity tests, this severely damaged connection seems the likely reason for the motor skipping phases. My recomendation is that flying leads are soldered directly to the damaged pins and connected to a seperate connector that can be fixed to the chassis. Possibly a DB9. Replacing the steppers entirely is a possibility, but will be tricky due to the capstan-drive. Removing the stepper will probably mean re-winding and re-tensioning the system.

The capstan drums seem at risk already however, as the (nylon?) coating on the steel cable is severely deteriorated, cracked and flaking off. Once the coating fails sufficiently to expose the cable, the cable will begin to eat into the surface of the aluminium capstan drums, ruining them. The drums are not likely to be easily replaced, the motors and cable are.

While the cable is fine for testing use, if the Statasys is going to be used frequently, new cable should be sourced as a priority.

- Sci

27-11-2013

The milled parts should arrive any day now and, once installed, we should be ready for a first test print.

As far as I am concerned, based on the investment by members, a successful print of any description, using both extruders or not, is proof of working. Having experimented with Dual Extruders, the configuration too complicated to include this by the (self imposed) deadline.

Thanks Ian



01-11-2013

Currently the Stratasys is moving and the hot-ends/extruders are working. We are waiting for the aluminium to mount the hot-ends in.

Once this is completed, it shouldn't take much longer to have this completed and working.

However, as I mentioned on IRC, if we cannot have a completed print by Christmas, I think this project should be marked as 'not completable' (if there is such as word) and we call it a day...

Thanks Ian

16-05-2013

To the mailing list:

Hey all.

Right, finally got time today to do a thorough check-up on the stratasys. As I have rpreviously said, all internal mechanics (including the steppers) are in full working order, especially as I performed a strip and clean to it pre-move.

After a quick talk with Ian on Wednesday, I have traced all the cables and found all the documentation for the parts, ferrous detecting end-stops, x-y controller pin outs, steppers etc. I have removed the old and power hungry heaters and flourescent lights.

I have paird the stepper cables and made ready for the 4-wire board. Also gave another clean

Basically it is ready to be connected to control board and ready to run.

All we need now are to nice tourqey nema17 steppers, 2 j-hotends (ian has offered to source and will start pledge, less than £100). Once these have turned up and I've cad modeled them, i will design a nice clean and easily accesable mount for them in the existing hot end housing (also been cleaned).

Charles will need to add a ACNode and it'll be up and running as a tool for the space. But like the laser cutter and charles, I will be its main care-taker/daddy lol.

Hope this has cleared up any concerns or apprensions about having a fully working, accurate, industrial 3D printer in the space to be used by people with training.

Regards Hipster