Difference between revisions of "Hackspace Move"

From London Hackspace Wiki
Jump to navigation Jump to search
(42 intermediate revisions by 12 users not shown)
Line 1: Line 1:
 +
'''This page is old! For the continuing refurbishment of the space, see [[447_Hackney_Road/Improvements]]'''
 +
 
We will soon move to a new space in [[447_Hackney_Road  | 447 Hackney Road]].  This will be happening during March and April 2013.
 
We will soon move to a new space in [[447_Hackney_Road  | 447 Hackney Road]].  This will be happening during March and April 2013.
  
Line 7: Line 9:
 
See [[447_Hackney_Road  | 447 Hackney Road]].
 
See [[447_Hackney_Road  | 447 Hackney Road]].
  
== Planning ==
+
== How to Help ==
  
=== Expected schedule ===
+
=== Open Tasks ===
  
We need to be out of Cremer St before 30th April. To leave time for restorations and cleanup the actual move will happen on the weekends of '''13/14 April''', depending on how quickly we can sort out the new space.
+
If you have a bit of time and want to help out with the move, have a look at these lists.
  
<s>To ease the transition for everyone we aim to set up doorbot access to the new space soon.</s>
+
* [[/TODO | 447 TODO list]] (speak to [[User:marcbarto]], [[User:Sully]], [[User:JasperWallace]] for details)
 +
* [[447_Hackney_Road_/Power_works_list | Power works list]] (speak to [[User:Padski]] for details)
 +
* [[/Cremer_Restoration]] (speak to [[User:Asoko]], [[User:SimonK]], [[User:Padski]] for details)
 +
* We need someone to monitor Freecycle (speak to Jasper for details); there's a [[/FreecycleList]] with requests
 +
* ...
  
=== Planning Notes ===
+
=== Getting Involved ===
  
* [[/Timeline | Timeline/overview]]
+
If you have a bit of time and want to find out what there is left to do: have a look at the lists above, particularly [[/TODO#Simple_tasks_that_you_can_do_right_now]], and have a chat with the people mentioned (or others who may know what's currently going on.)
* [[/Logistics | Logistics - actually moving objects & infrastructure from A to B]]
 
* [[/Layout | The new space layout]] (under discussion)
 
* [[/Renovation | Build-out of new space]]
 
* [[/SizesAndShapes | Sizes and shapes of some existing equipment]]
 
* [[/Cremer_Restoration | Restoration requirements for our current space]]
 
* [[/FreecycleList | List of stuff to try to find as cheap as possible]]
 
  
=== Key Projects ===
+
If you have useful skills and want to help out with the move:
 +
* join the Infrastructure mailing list: http://groups.google.com/group/london-hack-space-infrastructure
 +
* join the infrastructure IRC channel on freenode.net, #london-hack-space-infrastructure
 +
*  [[Hackspace_Move/RegisterToHelp | Register to help here]] so we can plan well
  
A number of key activities and the people coordinating them. '''Highlighted*''' projects have been identified as critical: they are prerequisites for other work, or they establish what we can initially do at the space.
+
=== Making Important Decisions ===
  
==== Hackney Rd, basic infrastructure ====
+
Make sure to keep in touch with others, things move quickly, and many people are thinking about overlapping problems. When you're coordinating an activity make sure to involve other people in larger decisions.
* '''Walls*''': Paddy, Steve (Charles - workshop)
 
* '''Ventilation*''': Paddy, Steve
 
* '''Lift*''': Thomas/tgreer
 
* '''Power*''': alisonw (Charles - workshop)
 
* Door access: Mark/ms7821, tgreer
 
* Comms: Jasper, Thomas/tgreer
 
* Waste: Jasper
 
* (Drainage)
 
* (Flooring)
 
  
==== Hackney Rd, legal/regulations ====
+
Specifically this could mean:
* Fire safety (exits, extinguishers, lighting, etc): Russ
+
* Start discussing the task at hand with others, do research, find the right specialists.
* Accessibility:
+
* Write down a proposal.
 +
* Show it to others, amend it. (Any Etherpad/PiratePad service is good for this.)
 +
* For decisions that affect other teams, or the larger community: propose it on the infrastructure mailing list, or the main list (as appropriate)
  
==== Hackney Rd, functional areas ====
+
As a result it stops being your idea, and will be shaped by others. But it will often be much better.
* Workshop: Charles/solexious
 
* Wetlab: Will/will-h, biohackers
 
* Electronics: Eugene/mentar
 
* Darkroom: wyan
 
* "Music" or performance space (actual form tbd)
 
* Classroom
 
* Storage, shelves
 
  
==== Cremer St ====
+
== Planning ==
* Early removal of excess kit (move to 447 or give away): [[Hackspace Move/Pre Move Move]] Thomas/tgreer
 
* Cleanup
 
* Packing
 
* Restoration
 
  
==== The actual move ====
+
=== Expected schedule ===
* Loading:
 
* Transport: Thomas/tgreer
 
* Unloading: Sam/Eithin
 
* Set-up:
 
  
=== Meeting minutes ===
+
We need to be out of Cremer St before 30th April. To leave time for restorations and cleanup the actual move will happen on the weekend of '''13/14 April'''.
* [http://www.flickr.com/photos/dekstop/sets/72157633008182137/detail/ 16 March 2013: infrastructure coordination]
 
  
== Things to be aware of ==
+
=== Notes ===
  
=== Prepare your member box ===
+
(Not all of these pages are maintained. Should sort these and merge as appropriate.)
 +
(We should merge these pages.)
  
If you have a member box:
+
* [[/Key Projects | Key projects]]
* Make sure that it can be closed with the lid fitting properly
+
* [[/Layout | The new space layout]] (under discussion)
* Make sure it's clearly labeled with your name and membership reference number. You can find your reference number  at [https://london.hackspace.org.uk/members/ london.hackspace.org.uk/members/] after you have logged into the website.
+
* [[/SizesAndShapes | Sizes and shapes of some existing equipment]]
* Remove any loose items from on, around or under your box - we won't have an easy way of moving them and it's likely that they will get lost or damaged. You should take responsibility for moving these yourself.
+
* [[/Cremer_Restoration | Restoration requirements for our current space]]
* Due to the move we are no longer accepting new boxes in the existing space. If there is a spare space on the member shelves please leave it empty. You'll be able to add new boxes at the new space after the move.
+
* [[/FreecycleList | List of stuff to try to find as cheap as possible]]
  
=== Prepare your loaned equipment ===
+
=== Planning updates ===
 +
* [[/Planning/2013-03-25 | 25 March planning update]]
 +
* [http://www.flickr.com/photos/dekstop/sets/72157633008182137/detail/ 16 March 2013: infrastructure coordination meeting]
  
* Make sure it is labelled properly so it doesn't get lost
+
=== Progress updates ===
* If it is delicate or hard to move: prepare it for the move yourself, or even take it home for the duration of the move
+
* [[/Planning/2013-04-08 | 8th April progress update]]
 
 
=== Planning your deliveries ===
 
 
 
Since we will be mostly out of the existing space before 30 April, please take care when ordering items to be delivered to the current space. If there is any chance that  they will take more than a few weeks to arrive then don't have them sent to the space! We won't have access to the old building after we fully moved out.
 
  
 
== Frequently Asked Questions ==
 
== Frequently Asked Questions ==
  
 
See also [[New Space Search 2012#Frequently_Asked_Questions]] for a discussion of why a move is possible (and necessary) in 2013.
 
See also [[New Space Search 2012#Frequently_Asked_Questions]] for a discussion of why a move is possible (and necessary) in 2013.
 
=== When will the new space be open to members? ===
 
 
Doorbot is already set up, but restricted to a few key people who help out with the move. General member access will be set up around the time of the actual move, sometime in mid/late April.
 
 
See also: [[#Expected Schedule]].
 
  
 
=== What modifications does our lease allow? ===
 
=== What modifications does our lease allow? ===
Line 106: Line 79:
  
 
(Answer)
 
(Answer)
 +
 +
[[Category:Moving_Space]]
 +
[[Category:Events]]

Revision as of 16:52, 16 October 2013

This page is old! For the continuing refurbishment of the space, see 447_Hackney_Road/Improvements

We will soon move to a new space in 447 Hackney Road. This will be happening during March and April 2013.

There's lots do do. Moving will be an enormous task, and will take at least an entire weekend (and probably several weeks worth of time in preparation). Here are some resources that help us coordinate this.

Location

See 447 Hackney Road.

How to Help

Open Tasks

If you have a bit of time and want to help out with the move, have a look at these lists.

Getting Involved

If you have a bit of time and want to find out what there is left to do: have a look at the lists above, particularly /TODO#Simple_tasks_that_you_can_do_right_now, and have a chat with the people mentioned (or others who may know what's currently going on.)

If you have useful skills and want to help out with the move:

Making Important Decisions

Make sure to keep in touch with others, things move quickly, and many people are thinking about overlapping problems. When you're coordinating an activity make sure to involve other people in larger decisions.

Specifically this could mean:

  • Start discussing the task at hand with others, do research, find the right specialists.
  • Write down a proposal.
  • Show it to others, amend it. (Any Etherpad/PiratePad service is good for this.)
  • For decisions that affect other teams, or the larger community: propose it on the infrastructure mailing list, or the main list (as appropriate)

As a result it stops being your idea, and will be shaped by others. But it will often be much better.

Planning

Expected schedule

We need to be out of Cremer St before 30th April. To leave time for restorations and cleanup the actual move will happen on the weekend of 13/14 April.

Notes

(Not all of these pages are maintained. Should sort these and merge as appropriate.) (We should merge these pages.)

Planning updates

Progress updates

Frequently Asked Questions

See also New Space Search 2012#Frequently_Asked_Questions for a discussion of why a move is possible (and necessary) in 2013.

What modifications does our lease allow?

"Structural changes" need to be signed off by the landlord. This includes the erection of new walls, drilling large holes in existing walls (e.g. for ventilation), etc.

Non-structural changes are fine; this includes painting walls, markings, mounting of equipment and other small changes.

(Question)

(Answer)