Difference between revisions of "Hackspace Move/Electronics"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
== Electronics stations == | == Electronics stations == | ||
+ | |||
+ | Responsible: [[user:mentar|mentar]] | ||
+ | |||
+ | The plan is to have 2 soldering and 1 test bench upstairs | ||
+ | |||
== Etching station == | == Etching station == | ||
+ | |||
+ | The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs near the biolab. |
Revision as of 22:12, 24 March 2013
Electronics stations
Responsible: mentar
The plan is to have 2 soldering and 1 test bench upstairs
Etching station
The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs near the biolab.