Difference between revisions of "Hackspace Move/Electronics"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
== Electronics stations ==
 
== Electronics stations ==
 +
 +
Responsible: [[user:mentar|mentar]]
 +
 +
The plan is to have 2 soldering and 1 test bench upstairs
 +
  
 
== Etching station ==
 
== Etching station ==
 +
 +
The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs near the biolab.

Revision as of 22:12, 24 March 2013

Electronics stations

Responsible: mentar

The plan is to have 2 soldering and 1 test bench upstairs


Etching station

The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs near the biolab.