Difference between revisions of "Hackspace Move/Planning/2013-04-08"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 8: Line 8:
  
 
[[File:20130329_163135.jpg|400px]]
 
[[File:20130329_163135.jpg|400px]]
 
And boxes for sockets installed
 
 
[[File:20130407_200350.jpg|400px]]
 
  
 
And started downstairs
 
And started downstairs
Line 21: Line 17:
 
[[File:20130329_163844.jpg|400px]]
 
[[File:20130329_163844.jpg|400px]]
  
And downstairs
+
Gaps filled and sanded, and boxes for sockets installed
 +
 
 +
[[File:20130407_200350.jpg|400px]]
 +
 
 +
And started downstairs
  
 
[[File:20130329_163255.jpg|400px]]
 
[[File:20130329_163255.jpg|400px]]

Revision as of 13:05, 8 April 2013

Last week

The basement floor was lifted

20130329 181326.jpg

The drywall erected upstairs

20130329 163135.jpg

And started downstairs

20130329 163356.jpg

Upstairs was rockwalled

20130329 163844.jpg

Gaps filled and sanded, and boxes for sockets installed

20130407 200350.jpg

And started downstairs

20130329 163255.jpg

Run network cabling for the ground floor

20130329 181051.jpg

Got the lift functional, although we still don't have insurance, so please don't use it for travelling in

20130406 171659.jpg

Taken one asbestos-based tile down and put it in the storage room by the main door. Please don't touch it - if you do, contact the trustees.

20130406 173357.jpg

Covered the fire exit to prevent heat escaping. This will be modified again shortly as it's probably intended to be a smoke vent in case of fire.

20130406 172453.jpg


This weekend

Filled the gaps

20130406 172232.jpg

Prepared the concrete

20130406 172603.jpg

To paint the floor

20130406 173517.jpg

Finished product. There are some cracks near the lift that still need filling

20130406 220148.jpg

Removed the chalky paint from the floor of the metal workshop, which will be painted on Monday/Tuesday evening

20130407 190606.jpg

Biohackers are filling gaps for their lab, and will be painting during the week

20130407 190424.jpg