Difference between revisions of "Hackspace Move/TODO"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 8: Line 8:
 
=== Classroom ===
 
=== Classroom ===
  
* fit power and <s>network sockets</s> in the new walls. Network sockets done and gigabit certified.
+
* fit <s>power</s> and <s>network sockets</s> in the new walls. Network sockets done and gigabit certified.
 
* finish new walls.
 
* finish new walls.
 
* <s>lift and fix broken bits of floor</s>  
 
* <s>lift and fix broken bits of floor</s>  
Line 15: Line 15:
 
* fit access point to ceiling
 
* fit access point to ceiling
 
* paint walls:
 
* paint walls:
** what colour? plain matt white?
+
** plain matt white?
  
 
=== Lobby ===
 
=== Lobby ===

Revision as of 21:49, 12 April 2013

Pre Move

All this stuff needs to be done before we can officially open

Ground Floor

Classroom

  • fit power and network sockets in the new walls. Network sockets done and gigabit certified.
  • finish new walls.
  • lift and fix broken bits of floor
    • will probably need the shelving removed
  • finish a few trunking bits
  • fit access point to ceiling
  • paint walls:
    • plain matt white?

Lobby

  • fix doorbell

Elsewhere

  • more network sockets
  • more power sockets
  • clean under windows. - 1/4 done

quiet room

  • run network to basement
  • fit access point.
  • move shelves
  • paint walls
  • clean windows
  • replace damaged flooring
    • need to re-attach skirting board.

Back door area

  • fix doorlock (please!).
  • finish some trunking bits.
  • finish boxing in doorbot.

Basement

Workshop

  • Filler walls
  • Paint metal shop floor
  • Sand walls - Thursday
  • Paint walls - Thursday
  • Clad miniworkshop walls - Friday
  • Put up power/network trunking - Friday
  • Place tools - Saturday
  • Place sockets/run cable - Saturday/Sunday
  • Run extraction to tools
  • Automate filtration
  • Run plumbing to workshop sink/biolab

biohacker room

  • power sockets

internets

  • fttc
  • config an access point
    • test it
    • clone config to other ap's
    • mount access points tidly

Post Move

This is a list of things that arn't vital to the space function but need to get done

Ground floor

Classroom

  • Fit projector screen
  • Fit projector
  • Led board

elsewhere

  • lasercutter

Lobby Area

  • signage

basement

  • Led board

Internets

  • fit and fix the bandwidth meter
  • spacefed
  • v6 tunnel (?)
  • A&A v6
  • bufferbloat kernel and tuning
  • bandwidth management of some kind.