Difference between revisions of "Pledge: Basement plumbing"

From London Hackspace Wiki
Jump to navigation Jump to search
m
m
Line 17: Line 17:
  
 
===Budget estimation===
 
===Budget estimation===
* £750. (£500 for pump and other items, rest on misc, or to be determined if there is excess funds. )
+
* £800. (£500 for pump and other items, rest on misc, or to be determined if there is excess funds. )
  
The budget was revised because the items came in cheaper than the original estimate.
 
  
 
===Pledge name for payment===
 
===Pledge name for payment===
Line 38: Line 37:
 
* <s>£25 - [[User:Fuxy|Fuxy]]</s> '''PAID'''
 
* <s>£25 - [[User:Fuxy|Fuxy]]</s> '''PAID'''
 
* <s>£25 - [[User:Ms7821|Mark]]</s> '''PAID'''
 
* <s>£25 - [[User:Ms7821|Mark]]</s> '''PAID'''
 
Provisional pledges from mailing list
 
 
 
*<s>£50 alphacabbage1  ([https://groups.google.com/d/msg/london-hack-space/Jdm1-gpyL2A/Ho-RoVa3oeAJ is donating directly with bank transfer ) </s>'''PAID'''
 
*<s>£50 alphacabbage1  ([https://groups.google.com/d/msg/london-hack-space/Jdm1-gpyL2A/Ho-RoVa3oeAJ is donating directly with bank transfer ) </s>'''PAID'''
 +
*<s> £50 ܔܢܜܔηιηℓιℓιzιܔܢܜܔ‎ ( is a conditional donation https://groups.google.com/d/msg/london-hack-space/Jdm1-gpyL2A/8KaAbHvC1xAJ ) Payment was scheduled for 5th of November https://groups.google.com/d/msg/london-hack-space/Jdm1-gpyL2A/R9Y7ElTz2ecJ</s>'''PAID''' using reference ALLTHEPIPES
  
withdrawn
+
Running total: '''£800'''
 
 
*<s> £50 ܔܢܜܔηιηℓιℓιzιܔܢܜܔ‎ ( is a conditional donation https://groups.google.com/d/msg/london-hack-space/Jdm1-gpyL2A/8KaAbHvC1xAJ ) Payment was scheduled for 5th of November https://groups.google.com/d/msg/london-hack-space/Jdm1-gpyL2A/R9Y7ElTz2ecJ</s>
 
 
 
 
 
Running total: '''£750'''
 
  
Target: '''£750'''
+
Target: '''£800'''
  
Paid: '''£750'''
+
Paid: '''£800'''
  
 
[[Category:Pledges]]
 
[[Category:Pledges]]

Revision as of 21:32, 19 December 2013


Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013

Pledge leader: Will

The items

  • A pump to push waste water upstairs to main drain pipe.
  • Inflow and drainage pipes.

We should then have

  • Sink in the main workshop area with HOT WATER!
  • 1 Sink in PCB/darkroom area
  • working PCB etching tank
  • Sink in the Biolab

Budget estimation

  • £800. (£500 for pump and other items, rest on misc, or to be determined if there is excess funds. )


Pledge name for payment

  • PLUMBING

Pledges

Running total: £800

Target: £800

Paid: £800