Difference between revisions of "Pledge: Basement plumbing"
Jump to navigation
Jump to search
Billy Smith (talk | contribs) |
|||
Line 25: | Line 25: | ||
* £50 - Tom Hodder | * £50 - Tom Hodder | ||
* £25 - [[User:JasperWallace]] | * £25 - [[User:JasperWallace]] | ||
+ | * £25 - [[User:Billy Smith]] | ||
− | |||
− | Target: ''' | + | Running total: '''£500''' |
+ | |||
+ | Target: '''£300''' | ||
[[Category:Pledges]] | [[Category:Pledges]] |
Revision as of 03:39, 1 October 2013
Installation of running water and drainage (with pump) for the basement. Pledge opened: 29 jul 2013
Pledge leader: Will
The items
- A pump to push waste water upstairs to main drain pipe.
- Inflow and drainage pipes.
We should then have
- Sink in the main workshop area with HOT WATER!
- 1 Sink in PCB/darkroom area
- working PCB etching tank
- Sink in the Biolab
Budget estimation
- £800. (£590 for pump, rest on pipes. )
Pledges
- £400 -- Biohackers
- £50 - Tom Hodder
- £25 - User:JasperWallace
- £25 - User:Billy Smith
Running total: £500
Target: £300