Hackspace Move/Renovation: Difference between revisions
From London Hackspace Wiki
No edit summary |
No edit summary |
||
Line 19: | Line 19: | ||
==Car Park== | ==Car Park== | ||
* Member access for car parking and bike storage | * Member access for car parking and bike storage | ||
* Car or motorbike working | |||
* Paint spraying | |||
==Facilities== | ==Facilities== | ||
===Desk space=== | |||
*General areas should have good light | |||
*Laptop areas can be less roomy but not suffer glare | |||
===Quiet areas=== | |||
*Dual-use with workshops / meeting rooms | |||
*More than one needed to avoid conflicts but provide flexibility | |||
*Music | |||
*Film | |||
===Arts=== | |||
*Large flat area (might be part of adjacent construction area) | |||
*Sink | |||
*Drying | |||
*Spray paint not allowed | |||
*Might include etch station | |||
*Might include non-oily machinery such as laser cutter, 3d printing | |||
===Electronics=== | |||
*Mostly for precision equipment and testgear - clean, tidy. | |||
*Must have adequate parts storage | |||
*Can include small soldering area (but soldering can often be done on desk space) | |||
*Probably colocated with desks as activities are similar | |||
*Might include non-oily machinery such as laser cutter, 3d printing | |||
===Construction=== | |||
*General workshop. | |||
*May include popular tools such as pillar drill, rage saw. | |||
*Some overlap with arts, oily area, wood. | |||
===Woodwork=== | |||
*Kept separate from oily area | |||
*Dust extraction on individual tools | |||
*Possible overlap with several areas | |||
*Cannot overlap such that dust is a problem to other areas | |||
*Cannot overlap such that serfaces are contaminated with oil | |||
===Oily=== | |||
*Light metalwork, machine tools | |||
*Bike workshop | |||
*Lathes, Mills | |||
*Needs easy access to outside for incoming bikes | |||
*No grinding allowed | |||
===Dirty=== | |||
*Welding | |||
*Grinding | |||
==Total Costing== | ==Total Costing== | ||
The above will cost approximately - £xxx | The above will cost approximately - £xxx |
Revision as of 09:23, 9 January 2013
This page is for planning the build out of our new space, currently centred on 445 Hackney Road.
Please note, this is for planning on bringing up a new space to the level we currently enjoy, not wild new awesome things. (that can come after) This is so that we have a action and cost plan to maintain the level of our current space.
Basement
- Extraction for individual tools and room dust.
- Power distribution to the center of the room etc
- Moar network sockets around room (ACnode)
- Look at flooring situation
Ground Floor
- Moar network
- Mid room power
- Kitchen build out
- Electric release on the rear door
- Building of classroom
- Draft proof louver windows
Car Park
- Member access for car parking and bike storage
- Car or motorbike working
- Paint spraying
Facilities
Desk space
- General areas should have good light
- Laptop areas can be less roomy but not suffer glare
Quiet areas
- Dual-use with workshops / meeting rooms
- More than one needed to avoid conflicts but provide flexibility
- Music
- Film
Arts
- Large flat area (might be part of adjacent construction area)
- Sink
- Drying
- Spray paint not allowed
- Might include etch station
- Might include non-oily machinery such as laser cutter, 3d printing
Electronics
- Mostly for precision equipment and testgear - clean, tidy.
- Must have adequate parts storage
- Can include small soldering area (but soldering can often be done on desk space)
- Probably colocated with desks as activities are similar
- Might include non-oily machinery such as laser cutter, 3d printing
Construction
- General workshop.
- May include popular tools such as pillar drill, rage saw.
- Some overlap with arts, oily area, wood.
Woodwork
- Kept separate from oily area
- Dust extraction on individual tools
- Possible overlap with several areas
- Cannot overlap such that dust is a problem to other areas
- Cannot overlap such that serfaces are contaminated with oil
Oily
- Light metalwork, machine tools
- Bike workshop
- Lathes, Mills
- Needs easy access to outside for incoming bikes
- No grinding allowed
Dirty
- Welding
- Grinding
Total Costing
The above will cost approximately - £xxx