This page is for planning the build out of our new space, currently centred on 447 Hackney Road.
This page is for planning the build out of our new space at 447 Hackney Road.


Please note, this is for planning on bringing up a new space to the level we currently enjoy, not new things. (that can come after) This is so that we have a action and cost plan to maintain the level of our current space.
Please note, this is for planning on bringing up a new space to the level we currently enjoy, not new things. (that can come after) This is so that we have a action and cost plan to maintain the level of our current space.
Line 29: Line 29:


=== Internet ===
=== Internet ===
# identify location for servers & switches
# floodwire cat6 around both floors; need not be terminated immediately but installing wiring when empty is easier!


There are at least 2 live phone lines:
There are at least 2 live phone lines:
* 020 7729 4055
* 020 7729 4055
* 020 7729 7283
* 020 7729 7283
Line 38: Line 39:


===Storage===
===Storage===
*Members boxes
*Members boxes
*Rarely-used equipment
*Rarely-used equipment

Revision as of 18:59, 15 March 2013

This page is for planning the build out of our new space at 447 Hackney Road.

Please note, this is for planning on bringing up a new space to the level we currently enjoy, not new things. (that can come after) This is so that we have a action and cost plan to maintain the level of our current space.

Building Front

  • Planning permission on changing the frontage/signage
  • Asking the Grafitti artist (Ben Eine) that did the 'M' on the shutters if he's ok with us changing it to an 'H', maybe he could do it for us :P

Basement

  • Panel basement Fire Exit with plywood
  • Extraction for individual tools and room dust.
  • Power distribution to the center of the room etc
  • Moar network sockets around room (ACnode)
  • Look at flooring situation

Ground Floor

  • Moar network
  • Mid room power
  • Electric release on the rear door
  • Building of classroom
  • Draft proof louvre windows

Car Park

  • Member access for car parking and bike storage. Can we use doorbot to restrict/enable access?
  • Garden/bbq area.

Facilities

Internet

  1. identify location for servers & switches
  2. floodwire cat6 around both floors; need not be terminated immediately but installing wiring when empty is easier!

There are at least 2 live phone lines:

  • 020 7729 4055
  • 020 7729 7283

FTTC looks like it's available

Storage

  • Members boxes
  • Rarely-used equipment
  • Supplies

Disability considerations

Probably a legal requirement as change of use likely on taking new place.

  • Disabled-access toilet (Mobility bars, light switch) (doesn't have to be disab-only but preferable if can be)
  • Low light switches (ask Sparky to certify?) or use ceiling-mounted pullcords full-height
  • Entrance ramp
  • Lower door laser
  • All enclosed spaces should have an alarm cord: not only in case of someone disabled falling but also in case anyone overcome by fumes and can't escape
  • General principle to not have power sockets at skirting level but always 3' off ground

Total Costing

The above will cost approximately - £xxx