Lab: Difference between revisions

From London Hackspace Wiki
No edit summary
Line 19: Line 19:
===HSE approval===
===HSE approval===
* £465 (need to check)
* £465 (need to check)
=== Ventilation ===
* Unclear about progress on this

Revision as of 13:28, 17 April 2013

Plans and costs for kitting out the lab

Plumbing

We need:

  • Pipe installed from water supply upstairs down to lab
  • Pipe installed from lab to pump, and from pump to drain
  • The pump itself
  • Sink

Cost:

  • ~£400 for pump

Benches

  • Tom's looking at Ikea

HSE approval

  • £465 (need to check)

Ventilation

  • Unclear about progress on this