53
edits
mNo edit summary |
mNo edit summary |
||
Line 19: | Line 19: | ||
'''CURRENT STATUS:''' | '''CURRENT STATUS:''' Working - Needs to be properly fixed to the floor and levelled. | ||
UPDATE: Shock absorber fixed. | UPDATE: Shock absorber fixed. | ||
Update: 20 Aug 2013 - Liam - cut and drilled new tensioner bar for the free end of the blade mounting. Fitted new blade and tested. Working OK. 5mm wall 50mm scaffold pole cut through in <20s! | |||
Needs: New cable, mounted in steel conduit and cut to length (Work can fall on and damage the present cable). | |||
Emergency stop mushroom in power feed on wall. | |||
Cage or guard needs fabricating for the top belt pulley. | |||
Floor levelling and machine needs bolting down. | |||
Extra work rest needs fabricating to support longer work pieces. | |||
[[File:Fullsaw.jpg|400px|thumb|right|A nice clean Donkey saw, please keep it that way.]] | [[File:Fullsaw.jpg|400px|thumb|right|A nice clean Donkey saw, please keep it that way.]] |