Line 24: | Line 24: | ||
Update: 20 Aug 2013 - Liam - cut and drilled new tensioner bar for the free end of the blade mounting. Fitted new blade and tested. Working OK. 5mm wall 50mm scaffold pole cut through in <20s! | Update: 20 Aug 2013 - Liam - cut and drilled new tensioner bar for the free end of the blade mounting. Fitted new blade and tested. Working OK. 5mm wall 50mm scaffold pole cut through in <20s! | ||
Needs: | Needs: | ||
Emergency stop mushroom in power feed on wall. | * New cable, mounted in steel conduit and cut to length (Work can fall on and damage the present cable). | ||
Cage or guard needs fabricating for the top belt pulley. | * Emergency stop mushroom in power feed on wall. | ||
Floor levelling and machine needs bolting down. | * Cage or guard needs fabricating for the top belt pulley. | ||
Extra work rest needs fabricating to support longer work pieces. | * Floor levelling and machine needs bolting down. | ||
* Extra work rest needs fabricating to support longer work pieces. | |||
[[File:Fullsaw.jpg|400px|thumb|right|A nice clean Donkey saw, please keep it that way.]] | [[File:Fullsaw.jpg|400px|thumb|right|A nice clean Donkey saw, please keep it that way.]] |