Line 69: | Line 69: | ||
== Log == | == Log == | ||
Update: 20 Aug 2013 - Liam - cut and drilled new tensioner bar for the free end of the blade mounting. Fitted new blade and tested. Working OK. 5mm wall 50mm scaffold pole cut through in <20s! | Update: 20 Aug 2013 - Liam Lynch - cut and drilled new tensioner bar for the free end of the blade mounting. Fitted new blade and tested. Working OK. 5mm wall 50mm scaffold pole cut through in <20s! | ||
Needs: | Needs: | ||
* New cable, mounted in steel conduit and cut to length (Work can fall on and damage the present cable). | * New mains cable, mounted in steel conduit and cut to length (Work can fall on and damage the present cable). | ||
* Emergency stop mushroom in power feed on wall. | * Emergency stop mushroom in power feed on wall. | ||
* Cage or guard needs fabricating for the top belt pulley | * Cage or guard needs fabricating for the top belt pulley, both sides of main machine | ||
* Floor levelling and machine needs bolting down. | * Floor levelling and machine needs bolting down. | ||
* Extra work rest needs fabricating to support longer work pieces. | * Extra work rest needs fabricating to support longer work pieces. |