Pledge: Vertical Wood Rack: Difference between revisions

From London Hackspace Wiki
No edit summary
No edit summary
 
(27 intermediate revisions by 8 users not shown)
Line 1: Line 1:
__NOTOC__ __NOEDITSECTION__
__NOTOC__ __NOEDITSECTION__
[[File:Wood rack back.jpg|400px|thumb|right|The proposed wood rack]]
[[File:Wood rack back.jpg|400px|thumb|right|The proposed wood rack (only vaguely accurate rendering)]]
[[File:Wood-rack-plan.jpg|400px|thumb|right|The proposed wood rack (dimensioned plan)]]
[[File:Wood-rack-joint.jpg|400px|thumb|right|The proposed wood rack (detail of braced joint)]]
[[File:Wood rack location.jpeg|400px|thumb|right|The proposed location for the rack]]
[[File:Wood rack location.jpeg|400px|thumb|right|The proposed location for the rack]]


'''PLEDGE NOW CLOSED (16th April 2014)'''


'''Pledge opened:''' Sunday 30th March
'''Pledge opened:''' Sunday 30th March


'''Pledge leader:''' [Felix]
'''Pledge leader:''' Felix [http://playwood.co/pledge PL(A)YWOOD]
 
'''Pledge deadline:''' Monday 21st April


==Introduction==
==Introduction==
Line 13: Line 18:
The idea is to install a wood rack, which makes better use of the space (ie use more of the vertical space) and keeps the wood more organised.
The idea is to install a wood rack, which makes better use of the space (ie use more of the vertical space) and keeps the wood more organised.


UPDATE: 2nd April - [https://groups.google.com/forum/#!topic/pl_a_ywood/qSx5VhoplEE A cheaper wood rack?]


===Budget estimation===
===Budget estimation===
We will need to get various bits of wood, some brackets, screws and rawl-plugs. All this will come to around £200.
We will need to get various bits of wood, screws and rawl-plugs. All this will come to around £100.


The wood is:
* 50x100x300 , 12 pcs
* Floor, ceiling parts between verticals: 2x(900, 950, 950) = 2 lengths
* Verticals 4 x (2690) = 2 lengths, ~300 spare
* Shelves 6 pcs:
  * Lower shelves 8x (500)
  * Upper shelves 12x (900)
  * split as 4x ( 900, 900, 500, 500) 1x (900, 900, 900)  1x (900  with 2100 spare)
* Floor brackets 14 x(150) = 2100 all taken from offcuts of above
* 50x50x300 2 pcs
* 1pcs 9x1220x2240 ply for joint braces




The following pieces of wood will be required (together with costing from a quote for rough sawn timber from T&T Timber Merchants Ltd):
{|
{|
! Dimensions
! Dimensions
Line 26: Line 44:
! Total
! Total
|- style="text-align:right;"
|- style="text-align:right;"
| 2"x6" || 3.6m || £9.85 || 11 || £108.37
|- style="text-align:right;"
|- style="text-align:right;"
| 2"x4" || 3m || £5.51 ||  6 || £33.05
| 2"x4" || 3m || £5.51 ||  12 || £66.72
|- style="text-align:right;"
| 2"x2" || 3.6m || £3.34 ||  2 ||  £6.67
|- style="text-align:right;"
|- style="text-align:right;"
| 2"x2" || 3.6m || £3.34 ||  2 || £6.67
| 9x1220x2240 || plywood || £19.50 ||  1 || £19.50
|- style="text-align:right;"
|- style="text-align:right;"
| || || || || £148.09
| || || || || £92.90
|}
|}


Long screws and rawlplugs required.


===Specification===
===Specification===
Will has put together a SketchUp model of our proposal using 6"x2" sawn timber for the uprights and 4"x2" timber for the arms, based on my earlier very rough [https://groups.google.com/forum/#!msg/london-hack-space/1jrcXgOllIU/GdrM-HweZp4J design for the proposed location] (i.e. where the woodpile is now, but with a smaller footprint). See the [https://groups.google.com/forum/#!searchin/pl_a_ywood/rack/pl_a_ywood/HAa3J2ljbsk/XpUJA2avDsMJ PL(A)YWOOD forum] for further discussion.  
Will has put together a SketchUp model of our proposal using 6"x2" sawn timber for the uprights and 4"x2" timber for the arms, based on my earlier very rough [https://groups.google.com/forum/#!msg/london-hack-space/1jrcXgOllIU/GdrM-HweZp4J design for the proposed location] (i.e. where the woodpile is now, but with a smaller footprint). See the [https://groups.google.com/forum/#!searchin/pl_a_ywood/rack/pl_a_ywood/HAa3J2ljbsk/XpUJA2avDsMJ PL(A)YWOOD forum] for further discussion.  
Ed has put together a revised plan (see plan drawings) to reduce the cost [https://groups.google.com/forum/#!topic/pl_a_ywood/qSx5VhoplEE]. The rendering gives a decent idea of the gross design and placement of the larger parts. The main change is to replace the verticals with single 2x4s, with the joints braced on both sides with plywood plates. To save more money, the floor and ceiling brackets are replaced with parts made from offcuts.




==Pledges==
==Pledges==
* £10 -- Felix
* £10 -- Felix -- PAID (ref WOODRACK)
* £10 -- Will
* £10 -- Will - PAID (ref WOODRACK)
 
* £10 -- Mr Ed -- PAID (ref WOODRACK)
Running total: '''£20'''
* £10 -- Ben -- PAID (ref WOODRACK)
* £10 -- Jonathan -- PAID (ref WOODRACK)
* £20 -- Mark aka [[User:Booyaa]] -- PAID (ref woodrack)
* £10 -- Ian aka [[User:Thumper]] PAID (ref WOODRACK)
* £10 -- Antonio (gave cash to Will) - PAID (ref WOODRACK)
* £10 -- Remainder from Hackspace infrastructure fund (Russ)
* £10 -- Renato (Late but here) - PAID (ref woodrack)
Running total: '''£110'''


Target: '''£200'''
Target: '''£100'''




[[Category:Pledges]]
[[Category:Pledges]]

Latest revision as of 10:30, 16 April 2014

The proposed wood rack (only vaguely accurate rendering)
The proposed wood rack (dimensioned plan)
The proposed wood rack (detail of braced joint)
The proposed location for the rack

PLEDGE NOW CLOSED (16th April 2014)

Pledge opened: Sunday 30th March

Pledge leader: Felix PL(A)YWOOD

Pledge deadline: Monday 21st April

Introduction

The wood pile in the basement workshop seems to have a life of its own. It takes up a lot of room, and there are no proper guidelines to what should or should not go into the pile.

The idea is to install a wood rack, which makes better use of the space (ie use more of the vertical space) and keeps the wood more organised.

UPDATE: 2nd April - A cheaper wood rack?

Budget estimation

We will need to get various bits of wood, screws and rawl-plugs. All this will come to around £100.

The wood is:

  • 50x100x300 , 12 pcs
* Floor, ceiling parts between verticals: 2x(900, 950, 950) = 2 lengths
* Verticals 4 x (2690) = 2 lengths, ~300 spare
* Shelves 6 pcs:
  * Lower shelves 8x (500)
  * Upper shelves 12x (900)
  * split as 4x ( 900, 900, 500, 500) 1x (900, 900, 900)  1x (900  with 2100 spare)
* Floor brackets 14 x(150) = 2100 all taken from offcuts of above
  • 50x50x300 2 pcs
  • 1pcs 9x1220x2240 ply for joint braces


The following pieces of wood will be required (together with costing from a quote for rough sawn timber from T&T Timber Merchants Ltd):

Dimensions Lengths Price
(per length)
Qty
Rqd.
Total
2"x4" 3m £5.51 12 £66.72
2"x2" 3.6m £3.34 2 £6.67
9x1220x2240 plywood £19.50 1 £19.50
£92.90

Long screws and rawlplugs required.


Specification

Will has put together a SketchUp model of our proposal using 6"x2" sawn timber for the uprights and 4"x2" timber for the arms, based on my earlier very rough design for the proposed location (i.e. where the woodpile is now, but with a smaller footprint). See the PL(A)YWOOD forum for further discussion.

Ed has put together a revised plan (see plan drawings) to reduce the cost [1]. The rendering gives a decent idea of the gross design and placement of the larger parts. The main change is to replace the verticals with single 2x4s, with the joints braced on both sides with plywood plates. To save more money, the floor and ceiling brackets are replaced with parts made from offcuts.


Pledges

  • £10 -- Felix -- PAID (ref WOODRACK)
  • £10 -- Will - PAID (ref WOODRACK)
  • £10 -- Mr Ed -- PAID (ref WOODRACK)
  • £10 -- Ben -- PAID (ref WOODRACK)
  • £10 -- Jonathan -- PAID (ref WOODRACK)
  • £20 -- Mark aka User:Booyaa -- PAID (ref woodrack)
  • £10 -- Ian aka User:Thumper PAID (ref WOODRACK)
  • £10 -- Antonio (gave cash to Will) - PAID (ref WOODRACK)
  • £10 -- Remainder from Hackspace infrastructure fund (Russ)
  • £10 -- Renato (Late but here) - PAID (ref woodrack)

Running total: £110

Target: £100