Difference between revisions of "Hackspace Move/Renovation"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 19: Line 19:
 
==Car Park==
 
==Car Park==
 
* Member access for car parking and bike storage
 
* Member access for car parking and bike storage
 +
* Car or motorbike working
 +
* Paint spraying
  
 
==Facilities==
 
==Facilities==
 +
 +
===Desk space===
 +
 +
*General areas should have good light
 +
*Laptop areas can be less roomy but not suffer glare
 +
 +
===Quiet areas===
 +
 +
*Dual-use with workshops / meeting rooms
 +
*More than one needed to avoid conflicts but provide flexibility
 +
*Music
 +
*Film
 +
 +
===Arts===
 +
 +
*Large flat area (might be part of adjacent construction area)
 +
*Sink
 +
*Drying
 +
*Spray paint not allowed
 +
*Might include etch station
 +
*Might include non-oily machinery such as laser cutter, 3d printing
 +
 +
===Electronics===
 +
 +
*Mostly for precision equipment and testgear - clean, tidy.
 +
*Must have adequate parts storage
 +
*Can include small soldering area (but soldering can often be done on desk space)
 +
*Probably colocated with desks as activities are similar
 +
*Might include non-oily machinery such as laser cutter, 3d printing
 +
 +
===Construction===
 +
 +
*General workshop.
 +
*May include popular tools such as pillar drill, rage saw.
 +
*Some overlap with arts, oily area, wood.
 +
 +
===Woodwork===
 +
 +
*Kept separate from oily area
 +
*Dust extraction on individual tools
 +
*Possible overlap with several areas
 +
*Cannot overlap such that dust is a problem to other areas
 +
*Cannot overlap such that serfaces are contaminated with oil
 +
 +
===Oily===
 +
 +
*Light metalwork, machine tools
 +
*Bike workshop
 +
*Lathes, Mills
 +
*Needs easy access to outside for incoming bikes
 +
*No grinding allowed
 +
 +
===Dirty===
 +
 +
*Welding
 +
*Grinding
 +
  
 
==Total Costing==
 
==Total Costing==
  
 
The above will cost approximately - £xxx
 
The above will cost approximately - £xxx

Revision as of 09:23, 9 January 2013

This page is for planning the build out of our new space, currently centred on 445 Hackney Road.

Please note, this is for planning on bringing up a new space to the level we currently enjoy, not wild new awesome things. (that can come after) This is so that we have a action and cost plan to maintain the level of our current space.

Basement

  • Extraction for individual tools and room dust.
  • Power distribution to the center of the room etc
  • Moar network sockets around room (ACnode)
  • Look at flooring situation

Ground Floor

  • Moar network
  • Mid room power
  • Kitchen build out
  • Electric release on the rear door
  • Building of classroom
  • Draft proof louver windows

Car Park

  • Member access for car parking and bike storage
  • Car or motorbike working
  • Paint spraying

Facilities

Desk space

  • General areas should have good light
  • Laptop areas can be less roomy but not suffer glare

Quiet areas

  • Dual-use with workshops / meeting rooms
  • More than one needed to avoid conflicts but provide flexibility
  • Music
  • Film

Arts

  • Large flat area (might be part of adjacent construction area)
  • Sink
  • Drying
  • Spray paint not allowed
  • Might include etch station
  • Might include non-oily machinery such as laser cutter, 3d printing

Electronics

  • Mostly for precision equipment and testgear - clean, tidy.
  • Must have adequate parts storage
  • Can include small soldering area (but soldering can often be done on desk space)
  • Probably colocated with desks as activities are similar
  • Might include non-oily machinery such as laser cutter, 3d printing

Construction

  • General workshop.
  • May include popular tools such as pillar drill, rage saw.
  • Some overlap with arts, oily area, wood.

Woodwork

  • Kept separate from oily area
  • Dust extraction on individual tools
  • Possible overlap with several areas
  • Cannot overlap such that dust is a problem to other areas
  • Cannot overlap such that serfaces are contaminated with oil

Oily

  • Light metalwork, machine tools
  • Bike workshop
  • Lathes, Mills
  • Needs easy access to outside for incoming bikes
  • No grinding allowed

Dirty

  • Welding
  • Grinding


Total Costing

The above will cost approximately - £xxx