447 Hackney Road/Toilets: Difference between revisions
From London Hackspace Wiki
No edit summary |
|||
Line 4: | Line 4: | ||
** We want a strip of magnetic blackboard paint around the walls, broken by a neutral colour (TBC) at the top and bottom. This needs to be lighter than the current blackhole scheme. | ** We want a strip of magnetic blackboard paint around the walls, broken by a neutral colour (TBC) at the top and bottom. This needs to be lighter than the current blackhole scheme. | ||
** Are the walls paintable as is or do we need to prepare them? | ** Are the walls paintable as is or do we need to prepare them? | ||
*** Paintable as-is. There is flecked paint on the walls but we can't do much with that. | |||
* Floor. | * Floor. | ||
** The current vinyl is manky and coming up. We want to tile it. | ** The current vinyl is manky and coming up. We want to tile it. | ||
** Do we need to use levelling compound before we do this? Who has experience of tiling? What tools do we need? | ** Do we need to use levelling compound before we do this? Who has experience of tiling? What tools do we need? | ||
*** We won't be able to tell for sure until we rip the vinyl up, but it seems unlikely it'll need levelling compound. Tools needed: a trowel, a bucket, and some way of cutting tiles (If we can get hold of an electric diamond tile cutter, this step will be a lot easier). [[User:Russ|Russ]] ([[User talk:Russ|talk]]) 17:10, 16 October 2013 (UTC) | |||
* Plumbing. | * Plumbing. |
Revision as of 17:10, 16 October 2013
The Plan
- Paint.
- We want a strip of magnetic blackboard paint around the walls, broken by a neutral colour (TBC) at the top and bottom. This needs to be lighter than the current blackhole scheme.
- Are the walls paintable as is or do we need to prepare them?
- Paintable as-is. There is flecked paint on the walls but we can't do much with that.
- Floor.
- The current vinyl is manky and coming up. We want to tile it.
- Do we need to use levelling compound before we do this? Who has experience of tiling? What tools do we need?
- We won't be able to tell for sure until we rip the vinyl up, but it seems unlikely it'll need levelling compound. Tools needed: a trowel, a bucket, and some way of cutting tiles (If we can get hold of an electric diamond tile cutter, this step will be a lot easier). Russ (talk) 17:10, 16 October 2013 (UTC)
- Plumbing.
- Does any of the plumbing need work while we're ripping stuff apart? Now is the time.
- Electrics.
- The lights in the toilets are awful. We need low energy, bright bulbs in good fittings. The ceilings are very high.
- The two sections of the toilet are switched seperately. Do we want to keep one/both switch(es) or install PIRs like the kitchen?
- Cool Things.
- PIR sensors for space activity heatmap.
- Toiletcam