==Design concept== | ==Design concept== | ||
[[File: | [[File:Image045.jpg|thumb|Progress as of 23rd Sept, 2012]] | ||
To create an ultra-high vacuum source capable of being purposed to a wide range of high-vacuum related tasks. | To create an ultra-high vacuum source capable of being purposed to a wide range of high-vacuum related tasks. | ||
Line 90: | Line 90: | ||
Some [https://groups.google.com/forum/#!topic/london-hack-space/lqF1zd3baAY additional parts] will be needed. | Some [https://groups.google.com/forum/#!topic/london-hack-space/lqF1zd3baAY additional parts] will be needed. | ||
*Water pump (for cooling loop). | *Water pump (for cooling loop). | ||
*1.5-2" thick, ~4" wide sturdy plastic (delrin?) to turn an large threaded fitting for the chamber. | *1.5-2" thick, ~4" wide sturdy plastic (delrin?) to turn an large threaded fitting for the chamber. | ||
**I have a 100m dia, 45mm thick lump of nylon and a fair bit of 50mm delrin if it's any use. artag. | **I have a 100m dia, 45mm thick lump of nylon and a fair bit of 50mm delrin if it's any use. artag. | ||
Line 144: | Line 142: | ||
Also donated a water-flow meter. Currently runs on 24v relay, but has fitting for hall-sensor control, so suggest gutting of stock electronics and wiring directly into control systems. | Also donated a water-flow meter. Currently runs on 24v relay, but has fitting for hall-sensor control, so suggest gutting of stock electronics and wiring directly into control systems. | ||
'''''23-09-2012''''' | |||
Most of the welding is done, but we ran out of welding gas. Need more before transformer mounts can be done. | |||
Dry-fitting has begun, though will need short 5/16ths 24tpi Whitworth bolts to connect to chamber base. | |||
Backing pump has been mounted on anti-vibration feet. | |||
Welds will need grinding flat and re-doing in places once dry-fit of all parts is done and setup proved. |