Difference between revisions of "Hackspace Move/Cremer Restoration"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
* Restore partition in loo and replace any loos or basins that have been removed | * Restore partition in loo and replace any loos or basins that have been removed | ||
* Fit new glass where extraction for lasercutter is currently, fill in hole where the duct comes through the wall from the workshop. | * Fit new glass where extraction for lasercutter is currently, fill in hole where the duct comes through the wall from the workshop. | ||
− | * Paint over the Jonty | + | * Paint over the Jonty mural |
==Outside== | ==Outside== | ||
* Sweep balconies for any items | * Sweep balconies for any items |
Revision as of 23:54, 10 January 2013
This is a list of things that need to be fixed or restored once we leave Cremer st. Please add anything you can think of, they will be struck off once we have confirmation that the work doesn't need to be done, or is completed.
Unit 24
- Restore connecting wall to 23
- Restore kitchen
- Paint all walls white in main rooms and toilets
- Remove internal walls and false ceiling
- Remove waste pipe to 23
- Remove plastic strips
- Repair holes in front door
Unit 23
- Fix holes in back door
- Restore partition in loo and replace any loos or basins that have been removed
- Fit new glass where extraction for lasercutter is currently, fill in hole where the duct comes through the wall from the workshop.
- Paint over the Jonty mural
Outside
- Sweep balconies for any items