Difference between revisions of "Lab"

From London Hackspace Wiki
Jump to navigation Jump to search
(Created page with "==Building the lab:== ===Plumbing=== We need: * Pipe installed from water supply upstairs down to lab * Pipe installed from lab to pump, and from pump to drain * The pump i...")
 
Line 12: Line 12:
 
Cost:
 
Cost:
  
~£400 for pump
+
*~£400 for pump

Revision as of 12:38, 8 April 2013

Building the lab:

Plumbing

We need:

  • Pipe installed from water supply upstairs down to lab
  • Pipe installed from lab to pump, and from pump to drain
  • The pump itself
  • Sink

Cost:

  • ~£400 for pump