News/2012-01-30: Difference between revisions

From London Hackspace Wiki

m
No edit summary
Line 6: Line 6:


* The kitchen is currently being kitted out, mostly by Phil. Please bear with some of its contents being in the main room until then.
* The kitchen is currently being kitted out, mostly by Phil. Please bear with some of its contents being in the main room until then.
* A leak coincided with running water to the kitten, but Paddy traced it to the boiler and [https://groups.google.com/d/topic/london-hack-space/ROOOUfIlzoc/discussion fixed it].
* A leak coincided with running water to the kitchen, but Paddy traced it to the boiler and [https://groups.google.com/d/topic/london-hack-space/ROOOUfIlzoc/discussion fixed it].


* The biohacking/dark room has also made [https://groups.google.com/d/topic/london-hack-space/qx5wRmmpKWo/discussion huge progress] lately, with a sink from Billy and black cloth from Akki14.
* The biohacking/dark room has also made [https://groups.google.com/d/topic/london-hack-space/qx5wRmmpKWo/discussion huge progress] lately, with a sink from Billy and black cloth from Akki14.
3,313

edits