306
edits
(Adding thoughts and general mumblings.) |
|||
Line 2: | Line 2: | ||
* Paint. | * Paint. | ||
** Estimated amount of time to do? Around a day per toilet or is that optimistic? | |||
** We want a strip of magnetic blackboard paint around the walls, broken by a neutral colour (TBC) at the top and bottom. This needs to be lighter than the current blackhole scheme. | ** We want a strip of magnetic blackboard paint around the walls, broken by a neutral colour (TBC) at the top and bottom. This needs to be lighter than the current blackhole scheme. | ||
*** Do we really ? If people have witty or erudite comments to make, must they be written on the toilet walls ? | *** Do we really ? If people have witty or erudite comments to make, must they be written on the toilet walls ? | ||
**** I am actually shocked at the lack of witty or erudite comments or penises on the walls of the toilets after over a YEAR of our occupation of the building... [[User:Akki14|Akki14]] ([[User talk:Akki14|talk]]) 21:36, 16 September 2014 (UTC) | |||
** Are the walls paintable as is or do we need to prepare them? | ** Are the walls paintable as is or do we need to prepare them? | ||
*** Paintable as-is. There is flecked paint on the walls but we can't do much with that. [[User:Russ|Russ]] ([[User talk:Russ|talk]]) 17:10, 16 October 2013 (UTC) | *** Paintable as-is. There is flecked paint on the walls but we can't do much with that. [[User:Russ|Russ]] ([[User talk:Russ|talk]]) 17:10, 16 October 2013 (UTC) | ||
* Floor. | * Floor. | ||
** Estimated amount of time by someone competent : 2 days per toilet? More? | |||
** Estimated amount of time by us amateurs without proper tools: Forever +1 day? What's the worse case scenario? Can we semi-train a small fleet of monkeys to work on it? Taking one toilet out of service for an extended amount of time isn't impossible if we need to pace ourselves. | |||
** The current vinyl is manky and coming up. We want to tile it. | ** The current vinyl is manky and coming up. We want to tile it. | ||
** What do we need to do close up around the base of the toilets? ATM they're weird manky wood iirc :S [[User:Akki14|Akki14]] ([[User talk:Akki14|talk]]) 21:36, 16 September 2014 (UTC) | |||
** Do we need to use levelling compound before we do this? Who has experience of tiling? What tools do we need? | ** Do we need to use levelling compound before we do this? Who has experience of tiling? What tools do we need? | ||
*** We won't be able to tell for sure until we rip the vinyl up, but it seems unlikely it'll need levelling compound. Tools needed: a trowel, a bucket, and some way of cutting tiles (If we can get hold of an electric diamond tile cutter, this step will be a lot easier). [[User:Russ|Russ]] ([[User talk:Russ|talk]]) 17:10, 16 October 2013 (UTC) | *** We won't be able to tell for sure until we rip the vinyl up, but it seems unlikely it'll need levelling compound. Tools needed: a trowel, a bucket, and some way of cutting tiles (If we can get hold of an electric diamond tile cutter, this step will be a lot easier). [[User:Russ|Russ]] ([[User talk:Russ|talk]]) 17:10, 16 October 2013 (UTC) | ||
Line 26: | Line 31: | ||
** Small hanging basket with plants near the windows. | ** Small hanging basket with plants near the windows. | ||
** miko (full size infinity mirrors! Mirror glass/reflecting metal on left and right walls) | ** miko (full size infinity mirrors! Mirror glass/reflecting metal on left and right walls) | ||
** Small, custom lasercut mirrored acrylic (A3/biggest our lasercutter does). Less steal-able/breakable. More cool. | |||
* Hot things | * Hot things |