Hackspace Move/Renovation
From London Hackspace Wiki
This page is for planning the build out of our new space, currently centred on 445 Hackney Road.
Please note, this is for planning on bringing up a new space to the level we currently enjoy, not wild new awesome things. (that can come after) This is so that we have a action and cost plan to maintain the level of our current space.
Basement
- Extraction for individual tools and room dust.
- Power distribution to the center of the room etc
- Moar network sockets around room (ACnode)
- Look at flooring situation
Ground Floor
- Moar network
- Mid room power
- Kitchen build out
- Electric release on the rear door
- Building of classroom
- Draft proof louver windows
Car Park
- Member access for car parking and bike storage
- Car or motorbike working
- Paint spraying
Facilities
Desk space
- General areas should have good light
- Laptop areas can be less roomy but not suffer glare
Quiet areas
- Dual-use with workshops / meeting rooms
- More than one needed to avoid conflicts but provide flexibility
- Music
- Film
Arts
- Large flat area (might be part of adjacent construction area)
- Sink
- Drying
- Spray paint not allowed
- Might include etch station
- Might include non-oily machinery such as laser cutter, 3d printing
Electronics
- Mostly for precision equipment and testgear - clean, tidy.
- Must have adequate parts storage
- Can include small soldering area (but soldering can often be done on desk space)
- Probably colocated with desks as activities are similar
- Might include non-oily machinery such as laser cutter, 3d printing
Construction
- General workshop.
- May include popular tools such as pillar drill, rage saw.
- Some overlap with arts, oily area, wood.
Woodwork
- Kept separate from oily area
- Dust extraction on individual tools
- Possible overlap with several areas
- Cannot overlap such that dust is a problem to other areas
- Cannot overlap such that serfaces are contaminated with oil
Oily
- Light metalwork, machine tools
- Bike workshop
- Lathes, Mills
- Needs easy access to outside for incoming bikes
- No grinding allowed
Dirty
- Welding
- Grinding
Storage
- Members boxes
- Rarely-used equipment
- Supplies
Total Costing
The above will cost approximately - £xxx