The London Hackspace has a 30 meter trailer mast currently living in the yard.
It was donated to us in a bit of a worn down condition after sitting in a field for many years. It was originally used by a utility company and repainted in company colours as each utility company rebranded or was acquired. The intended use of the mast is to use it to improve our radio signal propagation/reception at the Hackspace, provide useful utility during field day activities and festivals like Electromagnetic Field and more. The mast can also house a camera and even be configured for semi-permanent mounting.
During the time since acquisition, we've had various challenges from procuring the right parts to having sunny days to service the equipment, but we are getting there. Recently work was stalled due to a bent segment and replacement screws that turned out to be slightly too long once screwed into the assembly. We're getting back to progress on the mast.
Even though this trailer is maintained by the amateur radio club, once assembled, we can share its use with related LHS groups (e.g. quadcopter obstacle course, brain hacker nodule pole, etc.)
Original pledge for replacement parts: Pledge:Trailer_Mast
Clark 63/100 Mast Documentation File:TrailerMastManual.pdf
Specifications
Trailer/Mast Specifications | |
---|---|
Make | Clark Masts |
Model | 63/100 Trailer Mounted Mast |
Age | Manufactured during the 1970s |
Extended Height | 30m (100') |
Antenna Attachment | Standard Socket 24mm diameter
(Currently has a pole lodged in it) |
Trailer Length | 5.9m |
Trailer Width | 1.9m |
Trailer Height (with mast stowed) | 1.8m |
Trailer Wheel Size | 185/80R15 Tyres + innertubes |
Maximum Recommended Headload | 11.4kgs (Over 20m extension)
27 kgs (Under 20m extension) |
Maximum Safe Windspeed | 16 km/h (Unguyed)
96 km/h (Guyed with middle and top guys) |
Picket Radius | 18m |
Nett Weight (Mast + Trailer) | 1,088 kgs |
Time to Extend | 10 mins |
Time to Retract | 6 mins |
Engine Specifications | |
Compressor Make | Clark No. 2 Single Cylinder 3" Bore x 44mm Stroke |
Engine Make | 2hp Briggs & Stratton 4 Stroke Single Cylinder |
https://docs.google.com/drawings/d/1m7stWPsxvypnEcJHj0fhJH8rFikoyqbqeej_nzJeFTo/edit?usp=sharing Link to (rough) schematics of mud guards that need to be remade
Work Required
(This is in some sort of vague order)
- Strip existing paint and rust
- Rustproofing
- Replace all seals and serviceable components
- - this is where we were having trouble - turns out the screws are a little too long and we need to fix this (either by reorder or by grinding down the screwtips 0.5mm)
- - £165 + vat + delivery for a complete set of seals, O-rings, and grease. Need to provide measurements to Clark.
- Unbend the bent antenna segment or replace from donor SCAM mast
- Painting with a suitable exterior grade paint
- http://www.hammerite.co.uk/products/direct_to_rust_metal_paint_smooth_finish.jsp - Hackspace blue!
- The original colour was Caterpillar Yellow BS G88/0668. Might be nice to get it in original condition.
- Welding/fabricating replacement parts where required, i.e. wheelarches, reflector arms
Paint Stripping
There is some Nitromore in the engine compartment and some rubber gloves in Velyks's memberbox. Directions for use:
- Pour amount into metal bucket
- Dab on a thick layer over painted surface so it's all covered
- Leave for 40 mins
- Use scrapers to scrape paint off
- Clean brush and bucket when you're done
Try and work from the back towards the front.
ALWAYS WEAR THE SAFETY GLOVES AND CLEAN OFF ANY GUNK YOU GET ON YOUR SKIN. THIS SHIT IS NASTY
Replacement Screws
We might as well replace some of the knackered screws. Especially as we damaged some removing them.
- 3/8" BSF x 5/16" Allen Socket Screw
- Qty: 85
- 2 BA x 9/16" Ch. Hd. Steel Screw
- Qty: 86
- 2 BA x 1/2" Csk. Hd. Steel Screw
- Qty: 60
Sladen Clark Mast Braindump Notes (Thank you Paul!)
Manage the easy stuff first, perhaps bring in the top two pieces indoors of the mast and work on the bits inside:
- be mindful that the screws may be too long (even by a millimeter – we do not want the screws to scratch the tubes by being too long – be prepared to lathe them down on the end. (Turns out this IS the case!)
- The easiest of the tubes may be easiest to manage (start small and build up)
- If the tubes are bent, it may be reasonable to actually shorten the tubes themselves to make it work better – i.e. a compromise tube will be better to do that way as well and won’t be a major impact to antenna abilities
- Shortening the tubes may also make it easier to hack on inside – then will also enable the ability to work on the heavier tubes This is a last resort, people - let's exhaust every other possibility!
Get the mast actually working in a limited fashion – could we get the bottom two to work and use that as a temporary setup? That would be our workaround temporarily. Use massive jubilee clamps to fit things together perhaps? (Let's just keep fixing things up)
While using the mast at the space: Use an electric compressor – much easier to manage accordingly than the petrol 20psi compressor that’s there. Equivalent of a Chinese 230v / 12v jobby would make sense – note that we need a volume of air instead of the high pressure tank to move these segments up. (Remember these original designs are meant for soldiers with hand-pumps to pump up the mast in battlefield)
Paul Sladen has a box of spare parts that are mainly the top and bottom of bent tubes that have been cut off – they are not useful in themselves but they can be the models of how things should appear / how things should be accordingly.
Clark Mast designs haven’t changed for 50 years – the 127.0mm spec tubes are actually imperial sizes that have been around for a long time.
We could possibly use a donor SCAM mast for the smaller tubes that move – in case we want to have an alternative, spares, or something that could get us going – but the generations are compatible within each other. Something to think about if we see something at a reasonable to good price on ebay or at a ham swap meet.
There are chamfer seals that could be replaced, but probably costs too much to create the short-run for the small amount of hobbyists.
FYI - The locking collars that we have are completely optional – they will hold the tower but they should not be depended on because they might bring water in, they are just for static setups and could get us in trouble if/when it goes below freezing.
Often these particular masts of similar were often used for ‘birds eye views’ of properties in addition to the typical comms requirements we'd expect them to have.
- Note - Locking collars inside the shack are not spinning freely – they should be able to screw out and in without any trouble. This could be a small project to get them freely moving.
- Consider painting them as a rainbow to keep track of the bits and segments – we have a tough time understanding the pieces/segments are corresponding to which part.
Future projects
- Replace raising crank with electric motor? Maybe? How hard is it to crank up?
- Electric start compressor engine? No?
- Replace petrol engine with electric motor? Yes!
References / External Links
- Paul Sladen's SCAM mast info website - Note that the SCAM mast is a cousin of our WT8 mast in the Clark 63/100 trailer assembly.
- Clark Masts Historical site
- Clark Masts Official Website - good luck getting a response from them!