Difference between revisions of "447 Hackney Road/Toilets"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 13: Line 13:
  
 
* Electrics.
 
* Electrics.
** The lights in the toilets are awful. We need low energy, decent bulbs in good fittings. The ceilings are very high.  
+
** The lights in the toilets are awful. We need low energy, bright bulbs in good fittings. The ceilings are very high.  
 
** The two sections of the toilet are switched seperately. Do we want to keep one/both switch(es) or install PIRs like the kitchen?  
 
** The two sections of the toilet are switched seperately. Do we want to keep one/both switch(es) or install PIRs like the kitchen?  
  

Revision as of 17:10, 16 October 2013

The Plan

  • Paint.
    • We want a strip of blackboard paint around the walls, broken by a neutral colour (TBC) at the top and bottom. This needs to be lighter than the current blackhole scheme.
    • Are the walls paintable as is or do we need to prepare them?
  • Floor.
    • The current vinyl is manky and coming up. We want to tile it.
    • Do we need to use levelling compound before we do this? Who has experience of tiling? What tools do we need?
  • Plumbing.
    • Does any of the plumbing need work while we're ripping stuff apart? Now is the time.
  • Electrics.
    • The lights in the toilets are awful. We need low energy, bright bulbs in good fittings. The ceilings are very high.
    • The two sections of the toilet are switched seperately. Do we want to keep one/both switch(es) or install PIRs like the kitchen?
  • Cool Things.
    • PIR sensors for space activity heatmap.
    • Toiletcam

Link Dump