Difference between revisions of "Hackspace Move/Renovation"

From London Hackspace Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
This page is for planning the build out of our new space, currently centred on 445 Hackney Road.
 
This page is for planning the build out of our new space, currently centred on 445 Hackney Road.
  
Please note, this is for planning on bringing up a new space to the level we currently enjoy, not wild new awesome things. (that can come after) This is so that we have a action and cost plan to maintain the level of our current space.
+
Please note, this is for planning on bringing up a new space to the level we currently enjoy, not new things. (that can come after) This is so that we have a action and cost plan to maintain the level of our current space.
  
 
==Basement==
 
==Basement==
Line 12: Line 12:
 
* Moar network
 
* Moar network
 
* Mid room power
 
* Mid room power
* Kitchen build out
 
 
* Electric release on the rear door
 
* Electric release on the rear door
 
* Building of classroom
 
* Building of classroom
Line 19: Line 18:
 
==Car Park==
 
==Car Park==
 
* Member access for car parking and bike storage
 
* Member access for car parking and bike storage
* Car or motorbike working
 
* Paint spraying
 
  
 
==Facilities==
 
==Facilities==
 
===Desk space===
 
 
*General areas should have good light
 
*Laptop areas can be less roomy but not suffer glare
 
 
===Quiet areas===
 
 
*Dual-use with workshops / meeting rooms
 
*More than one needed to avoid conflicts but provide flexibility
 
*Music
 
*Film
 
 
===Arts===
 
 
*Large flat area (might be part of adjacent construction area)
 
*Sink
 
*Drying
 
*Spray paint not allowed
 
*Might include etch station
 
*Might include non-oily machinery such as laser cutter, 3d printing
 
 
===Electronics===
 
 
*Mostly for precision equipment and testgear - clean, tidy.
 
*Must have adequate parts storage
 
*Can include small soldering area (but soldering can often be done on desk space)
 
*Probably colocated with desks as activities are similar
 
*Might include non-oily machinery such as laser cutter, 3d printing
 
 
===Construction===
 
 
*General workshop.
 
*May include popular tools such as pillar drill, rage saw.
 
*Some overlap with arts, oily area, wood.
 
 
===Woodwork===
 
 
*Kept separate from oily area
 
*Dust extraction on individual tools
 
*Possible overlap with several areas
 
*Cannot overlap such that dust is a problem to other areas
 
*Cannot overlap such that surfaces are contaminated with oil
 
 
===Oily===
 
 
*Light metalwork, machine tools
 
*Bike workshop
 
*Lathes, Mills
 
*Needs easy access to outside for incoming bikes
 
*No grinding allowed
 
 
===Dirty===
 
 
*Welding
 
*Grinding
 
 
  
 
===Storage===
 
===Storage===

Revision as of 19:26, 10 January 2013

This page is for planning the build out of our new space, currently centred on 445 Hackney Road.

Please note, this is for planning on bringing up a new space to the level we currently enjoy, not new things. (that can come after) This is so that we have a action and cost plan to maintain the level of our current space.

Basement

  • Extraction for individual tools and room dust.
  • Power distribution to the center of the room etc
  • Moar network sockets around room (ACnode)
  • Look at flooring situation

Ground Floor

  • Moar network
  • Mid room power
  • Electric release on the rear door
  • Building of classroom
  • Draft proof louver windows

Car Park

  • Member access for car parking and bike storage

Facilities

Storage

  • Members boxes
  • Rarely-used equipment
  • Supplies

Total Costing

The above will cost approximately - £xxx