Difference between revisions of "Infrastructure meeting"

From London Hackspace Wiki
Jump to navigation Jump to search
(Undo revision 15938 by Martind (talk))
Line 1: Line 1:
This documents efforts at improving the layout and infrastructure at the space.
+
We meet to argue about setting up Laboratory 23 & 24.
 +
 
 +
Saves on arguments later.
 +
 
 +
Come throw in your tuppence worth.
 +
 
 +
Come and offer the skills you've got.
 +
 
 +
Come and see what skills you can learn...
  
 
== Upcoming meetings ==
 
== Upcoming meetings ==
 
(none)
 
  
 
== Past meetings ==
 
== Past meetings ==
Line 10: Line 16:
 
== Ongoing projects ==
 
== Ongoing projects ==
  
=== Quiet Room carpet ===
+
More desks/work surfaces is vital, all available space is sometimes take up by people working from the space 9am-5pm ?!?
 
+
Apparantely getting the laser cutter moved is the main blocking issues to assembling a load of desks (apart from people
* Description: ...
+
getting miscellaneous bolts etc and actually assembing the desks)
* Status: carpet is there, fittings have been ordered
 
* People: Robert, Adrian
 
 
 
=== Kitchen Flooring ===
 
 
 
* Description: ...
 
* Status: need to put down a screed, needs to be ordered/bought. Then use the vinyl we have or buy resin paint. This requires financial assessment first.
 
* People: ?
 
 
 
=== Kitchen Plumbing ===
 
 
 
* Description: ...
 
* Status: hot water generator needs to be moved from unit 23, cold water pipe run to the kitchen, and waste water out.
 
* People: ?
 
 
 
=== Kitchen Wiring ===
 
 
 
* Description: wiring for oven and hob. Needs to be certified by an electrician.
 
* Status:
 
* People: Russ
 
 
 
=== Kitchen Units ===
 
 
 
* Description: ...
 
* Status: materials all there, need fitting in place once floor, wiring, plumbing are done.
 
* People: Phil
 
 
 
=== Wetlab/Darkroom ===
 
 
 
* Description: [[Darkroom]]
 
* Status: started building some work surfaces
 
* People: Phil, AlexP
 
 
 
=== Lab "Extractor" Bench ===
 
 
 
* Description: ...
 
* Status: needs removal. Auction off?
 
* People: ?
 
 
 
=== Unit 23 Toilet ===
 
 
 
* Description: ...
 
* Status: need to remove furnace, sweep it
 
* People: ?
 
 
 
=== Quiet Room Screen ===
 
 
 
* Description: for projections
 
* Status: need to obtain epoxy bolts, then put up screen
 
* People: Adrian (?)
 
 
 
=== Quiet Room Projector ===
 
 
 
* Description: replace existing projector with the NEC projector, mount it properly
 
* Status:
 
* People: ?
 
 
 
=== Reorganise use of Unit 23 Space ===
 
 
 
* Description: optimise storage areas etc
 
* Status: start with [[Space_Organising_Day]] and use as opportunity to assess the layout
 
* People: ?
 
 
 
=== Box in Lasercutter extraction ===
 
 
 
* Description: ...
 
* Status: ?
 
* People: Billy (?)
 
 
 
=== Tool Access Control ===
 
 
 
* Description: [[Projects/Tool_Access_Control]]
 
* Status: someone needs to implement this
 
* People: ?
 
 
 
=== Wiring Burglar Alarm Sensors ===
 
 
 
* Description: ... so we can monitor them, implement reminders ("close the back doors") etc
 
* Status:
 
* People: ?
 
 
 
=== Create "Time To Live" Stickers ===
 
 
 
* Description: to label unmarked objects that you want to nominate for removal. Cf Phil's "Do Not Hack" stickers.
 
* Status:
 
* People: ?
 

Revision as of 20:31, 28 June 2011

We meet to argue about setting up Laboratory 23 & 24.

Saves on arguments later.

Come throw in your tuppence worth.

Come and offer the skills you've got.

Come and see what skills you can learn...

Upcoming meetings

Past meetings

Ongoing projects

More desks/work surfaces is vital, all available space is sometimes take up by people working from the space 9am-5pm ?!? Apparantely getting the laser cutter moved is the main blocking issues to assembling a load of desks (apart from people getting miscellaneous bolts etc and actually assembing the desks)