Lab

From London Hackspace Wiki
Jump to navigation Jump to search

Plans and costs for kitting out the lab

Already spent

Paint + painting equipment, filler - ~£150

Plumbing

We need:

  • Pipe installed from water supply upstairs down to lab
  • Pipe installed from lab to pump, and from pump to drain
  • The pump itself
  • Sink

Cost:

  • ~£400 for pump

Benches

  • Tom's looking at Ikea

HSE approval

  • £465 (need to check)

Ventilation

  • Unclear about progress on this