Hackspace Move/Electronics
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Responsible: mentar
Dependencies
- Ventilation (Paddy, Steve, Charles)
- Mild HCL fumes likely during etching, filter must be able to deal with these
- Drainage (none!) - Normal requirements for etching, HCL not strong enough to warrant special treatment
- Power (alisonw)
- Comms (Jasper/tgreer) - Running water supply for etching
Logistics
Electronics related equipment and components have been packed in boxes labeled as "Electronics" or encircled "E"
Some Radio stuff is being moved along with the electronics equipment. Please stack nearby.
Electronics stations
The plan is to have 2 soldering and 1 test bench upstairs
Etching station
The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft.