1,581
edits
(→Radio) |
|||
| Line 14: | Line 14: | ||
=== Operations Centre === | === Operations Centre === | ||
* Should be a portacabin or some other physical structure, not a tent. Will want to be on-site during the build. | * Should be a portacabin or some other physical structure, not a tent. Will want to be on-site during the build. | ||
** How about [http://www.golden-agetv.co.uk/equipment.php?TypeID=25 one of these] ? | |||
* Needs reliable power and at least one radio base station (probably several for various channels, but there has to be an always-on hotline to event management team for emergencies on a dedicated channel) | * Needs reliable power and at least one radio base station (probably several for various channels, but there has to be an always-on hotline to event management team for emergencies on a dedicated channel) | ||