==Progress== | ==Progress== | ||
13.12.11 | |||
Derusted and polished 4 of the heddle frames | Derusted and polished 4 of the heddle frames | ||
Cleaned and adjusted the heddles - this is a temporary measure, they'll probably need replacing at some point. | |||
11.12.11 | |||
Replaced cruddy bolts holding beater, now running in brass bushes instead of directly in the wooden arms. | |||
Replaced frayed cords controlling warp beam release mechanism | |||
Removed light rust and polished shafts, frame guides etc. and reassembled castle | |||
9.12.11 | |||
Installed in loft, required taking it mostly apart to fit through the hatch. All held together with woodscrews so not difficult. | |||
Installed in loft, required taking it mostly apart to fit through the hatch. All held together with woodscrews so not difficult. | |||