Anonymous

Project:UK Hack Camp/Candidate sites: Difference between revisions

From London Hackspace Wiki
no edit summary
No edit summary
No edit summary
Line 124: Line 124:
|
|
| No existing infrastructure, toilets, power and network would be required.
| No existing infrastructure, toilets, power and network would be required.
|-
| [http://www.bentwatersparks.com/ Bent Waters Parks], IP12 2TW
|
|
|
| class="yellow" | [http://www.samknows.com/broadband/exchange/EAEYK EAEYK] poor, <= ADSL Max, 4.5km away. Looking into a 100Mbps fibre link, to be finished in August?
|
|
|-
|-
| [http://www.southwatereventgroup.com/the-international-centre Telford International Centre]
| [http://www.southwatereventgroup.com/the-international-centre Telford International Centre]
Line 311: Line 303:
|
|
| class="red" | [http://www.samknows.com/broadband/exchange/WNLED WNLED] fairly poor, TalkTalk, 2.5km away
| class="red" | [http://www.samknows.com/broadband/exchange/WNLED WNLED] fairly poor, TalkTalk, 2.5km away
|
|
|-
| [http://www.bentwatersparks.com/ Bent Waters Parks], IP12 2TW
|
|
|
| class="yellow" | [http://www.samknows.com/broadband/exchange/EAEYK EAEYK] poor, <= ADSL Max, 4.5km away. Looking into a 100Mbps fibre link, to be finished in August?
|
|
|
|
3,313

edits