Cremer st - Infrastructure: Difference between revisions

From London Hackspace Wiki
no edit summary
No edit summary
Line 9: Line 9:
* People: Robert, Adrian, Phil
* People: Robert, Adrian, Phil
* Schedule: Monitor for adhesion problems....
* Schedule: Monitor for adhesion problems....
=== Kitchen Flooring ===
* Description: ...
* Status: Floor done
* People: ?


=== Kitchen Plumbing ===
=== Kitchen Plumbing ===
Line 48: Line 42:


* People: Phil, AlexP, PaddyD
* People: Phil, AlexP, PaddyD
=== Lab "Extractor" Bench ===
* Description: ...
* Status: Dismantled and removed from Wet Lab. Fans have been kept for possible future use.
* People: ?


=== Unit 23 Toilet ===
=== Unit 23 Toilet ===
Line 60: Line 48:
* Status: Clean and tidy, Flushes OK. Washroom now contains a coat rack for Lab coats, coveralls, aprons etc.
* Status: Clean and tidy, Flushes OK. Washroom now contains a coat rack for Lab coats, coveralls, aprons etc.
* People: ?
* People: ?
=== Quiet Room Screen ===
* Description: for projections
* Status: <s> need to obtain epoxy bolts,</s> then put up screen
* People: Adrian (?)
* Proposal : <s>drill and epoxy bolts into ceiling near window. Drill auxiliary fixings to hold bolts in place while epoxy sets. After setting,</s> (done)  Perform pull test on bolts. Schedule team of helpers to lift screen into place and fix. These activities will create some dust, mess and brief disruption in the quiet room.
* Requirements : <s>epoxy capsules (I have some of these, possibly date-expired - artag), studding, large masonry drill bit, heavy duty power drill. I also have the latter 2, but can't bring them to the space cleaning day. It may be possible to do the drilling phase before that date.</s>
Update 15SEP11
* Progress: Bolts now fixed into ceiling, Mounting plates made and ready.
* Further requirements: Due to revised mounting method more materials as below
**12 off M10 full nuts
**12 off M10 flat washers
**4 off strong hackers to lift screen into place
**2 off weak hackers to fit the nuts
=== Quiet Room Projector ===
* Description: replace existing projector with the NEC projector, mount it properly
* Status: New mounting part built, replaces a ceiling tile. Final detail of mount depends upon geometry of projector to be used.
* People: Phil


=== Reorganise use of Unit 23 Space ===
=== Reorganise use of Unit 23 Space ===
Line 98: Line 64:


* Description: [[Projects/Tool_Access_Control]]
* Description: [[Projects/Tool_Access_Control]]
* Status: someone needs to implement this
* Status: working on a prototype atm
* People: ?
* People: [[User:Solexious|Sol]]


=== Wiring Burglar Alarm Sensors ===
=== Wiring Burglar Alarm Sensors ===
Line 112: Line 78:
* Status: HACK ME Stickers now available with space for "Dispose by" date
* Status: HACK ME Stickers now available with space for "Dispose by" date
* People: ?
* People: ?
== Completed projects ==
=== Kitchen Flooring ===
* Description: ...
* Status: Floor done
* People: ?
=== Lab "Extractor" Bench ===
* Description: ...
* Status: Dismantled and removed from Wet Lab. Fans have been kept for possible future use.
* People: ?
=== Quiet Room Projector ===
* Description: replace existing projector with the NEC projector, mount it properly
* Status: New mounting part built, replaces a ceiling tile. Final detail of mount depends upon geometry of projector to be used.
* People: Phil
=== Quiet Room Screen ===
* Description: for projections
* Status: <s> need to obtain epoxy bolts,</s> then put up screen
* People: Adrian (?)
* Proposal : <s>drill and epoxy bolts into ceiling near window. Drill auxiliary fixings to hold bolts in place while epoxy sets. After setting,</s> (done)  Perform pull test on bolts. Schedule team of helpers to lift screen into place and fix. These activities will create some dust, mess and brief disruption in the quiet room.
* Requirements : <s>epoxy capsules (I have some of these, possibly date-expired - artag), studding, large masonry drill bit, heavy duty power drill. I also have the latter 2, but can't bring them to the space cleaning day. It may be possible to do the drilling phase before that date.</s>
Update 15SEP11
* Progress: Bolts now fixed into ceiling, Mounting plates made and ready.
* Further requirements: Due to revised mounting method more materials as below
**12 off M10 full nuts
**12 off M10 flat washers
**4 off strong hackers to lift screen into place
**2 off weak hackers to fit the nuts