Where are we going to go? | Where are we going to go? | ||
=== Physical Space === | === Physical Space === | ||
Ideally, we need two separated areas for studio and engineering, to keep all the noisy equipment away from microphones. | |||
=== Power Supply === | === Power Supply === | ||
We will need to get a mains feed in and distributed to power all the equipment in the studio - and ideally some UPS to make sure we don't drop off air if there is a power outage. | We will need to get a mains feed in and distributed to power all the equipment in the studio and engineering - and ideally some UPS to make sure we don't drop off air if there is a power outage. | ||
* Can probably get away with a single 16A circuit for everything | * Can probably get away with a single 16A circuit for everything | ||
| Line 129: | Line 131: | ||
== Studio == | == Studio == | ||
To provide live broadcasting, we need a broadcast studio. | |||
=== Furniture === | === Furniture === | ||
We need some desks to put equipment on, and chairs to sit on. Unless we want to enforce standing up presenting, that is! | We need some desks to put equipment on, and chairs to sit on. Unless we want to enforce standing up presenting, that is! | ||
* HSS do furniture for fairly reasonably rates, plus (fairly unreasonable) delivery. | |||
** Depends where you are though! | |||
=== Monitoring === | === Monitoring === | ||