434
edits
Samthetechie (talk | contribs) (→Power) |
Samthetechie (talk | contribs) (→Power) |
||
| Line 85: | Line 85: | ||
* Heavy cabling needed from fusebox to planned cooking area | * Heavy cabling needed from fusebox to planned cooking area | ||
* Temporary power sockets near sink need sorting (unless kitchen plans make them redundant) | * Temporary power sockets near sink need sorting (unless kitchen plans make them redundant) | ||
* The 3 phase power is currently not being monitored. We can raise awareness about the use of electricity in the space and generated interest in | * The 3 phase power is currently not being monitored. We can raise awareness about the use of electricity in the space and generated interest in energy monitoring through this project: [[Projects/Energy-Consumption-Monitoring|Energy Consumption Monitoring]] | ||
== Procedure for improving [[infrastructure]] == | == Procedure for improving [[infrastructure]] == | ||