Hackspace Move/Timeline: Difference between revisions

From London Hackspace Wiki
Line 27: Line 27:
== [[Hackspace_Move/Renovation|Hackney Road build-out]] ==
== [[Hackspace_Move/Renovation|Hackney Road build-out]] ==
* Install the large classroom walls.
* Install the large classroom walls.
* Get a lift engineer out to verify that the lift really is safe to use and place heavy loads in.
<s>* Get a lift engineer out to verify that the lift really is safe to use and place heavy loads in.</s>Insurance issues still to be addressed
* Install ventilation downstairs, <s>routed outside.</s> (Charles?)
* Install ventilation downstairs, <s>routed outside.</s> (Charles?)
* Change current Fire Exit door in basement so it's solid rather than a grill, possibly by panelling with plywood [http://www.flickr.com/photos/hllns/8386735403/ (Pic)]
<s>* Change current Fire Exit door in basement so it's solid rather than a grill, possibly by panelling with plywood [http://www.flickr.com/photos/hllns/8386735403/ (Pic)]</s>
* Wall off entire fire exit door in basement
* Wall off entire fire exit door in basement
* Networking, including patch panels downstairs
* Networking, including patch panels downstairs