175
edits
No edit summary |
|||
Line 53: | Line 53: | ||
! 23-L !! status | ! 23-L !! status | ||
|- | |- | ||
| Replace window || done | | <s>Replace window</s> || done | ||
|- | |- | ||
! 23-R !! status | ! 23-R !! status | ||
Line 63: | Line 63: | ||
| <s>Patch hole to quiet room</s> || done-needs skimming once motar set | | <s>Patch hole to quiet room</s> || done-needs skimming once motar set | ||
|- | |- | ||
| install window above inner door (see instructions) || | | <s>install window above inner door (see instructions)</s> || | ||
|- | |- | ||
| remove and paint inner door - use grey undercoat first, and don't forget edges || done | | <s>remove and paint inner door - use grey undercoat first, and don't forget edges</s> || done | ||
|- | |- | ||
| install strike plate for inner door (spade drills and chisel are there) || | | install strike plate for inner door (spade drills and chisel are there) || | ||
Line 71: | Line 71: | ||
| replace inner door (after painting) || | | replace inner door (after painting) || | ||
|- | |- | ||
| Add beading/doorstop/strip (whatever you call it(intumesent strip?)) for inner door || done | | <s>Add beading/doorstop/strip (whatever you call it(intumesent strip?)) for inner door</s> || done | ||
|- | |- | ||
| <s>install toilet (may be in 23-L)</s> || done | | <s>install toilet (may be in 23-L)</s> || done | ||
Line 77: | Line 77: | ||
| <s>Create stand for sink out of lumber. (sink is probably stored in adjacent loo) It's quite heavy and won't be adequately supported by attaching to the wall. No, sink brackets were inside toilet cistern</s> || done | | <s>Create stand for sink out of lumber. (sink is probably stored in adjacent loo) It's quite heavy and won't be adequately supported by attaching to the wall. No, sink brackets were inside toilet cistern</s> || done | ||
|- | |- | ||
| <s>install plumbing for sink<s> || done | | <s>install plumbing for sink</s> || done | ||
|- | |- | ||
! 24-L !! status | ! 24-L !! status | ||
Line 85: | Line 85: | ||
! 24-R !! status | ! 24-R !! status | ||
|- | |- | ||
| remove stickers from toilet || | | <s>remove stickers from toilet</s> || | ||
|- | |- | ||
| clean toilet, if it still looks shit, repaint it black || | | <s>clean toilet, if it still looks shit, repaint it black</s> || | ||
|- | |- | ||
| Repair flush mechanism on toilets || | |||
|} | |} | ||
Line 95: | Line 96: | ||
! Task !! Status | ! Task !! Status | ||
|- | |- | ||
| HIGH PRIORITY: Finish block wall between 23 and 24(see howtos -- this is hard, requires 2 people!) || Done | | <s>HIGH PRIORITY: Finish block wall between 23 and 24(see howtos -- this is hard, requires 2 people!)</s> || Done | ||
|- | |- | ||
| HIGH PRIORITY: Fill square hole in unit 23 || done | | <s>HIGH PRIORITY: Fill square hole in unit 23</s> || done | ||
|- | |- | ||
| <s>unit 24 -- build simple counter supported by frame made from 2x4 timber and install sink in original location, outside loo 23-L. Will need jigsaw from newspace.</s> || done | | <s>unit 24 -- build simple counter supported by frame made from 2x4 timber and install sink in original location, outside loo 23-L. Will need jigsaw from newspace.</s> || done | ||
Line 103: | Line 104: | ||
| <s>Kitchen -- remove cabinets non-destructively, we want them.</s> || done | | <s>Kitchen -- remove cabinets non-destructively, we want them.</s> || done | ||
|- | |- | ||
| Kitchen -- wash nasty wall and windowsills, and repaint || | | <s>Kitchen -- wash nasty wall and windowsills, and repaint</s> || | ||
|- | |- | ||
| <s>unit 24 -- plug/fill hole in front door where camera was</s> || done-needs sanding | | <s>unit 24 -- plug/fill hole in front door where camera was</s> || done-needs sanding | ||
Line 113: | Line 114: | ||
| tidy everything up inside, remove rubbish -- junk left behind will probably be removed by landlord at our expense || | | tidy everything up inside, remove rubbish -- junk left behind will probably be removed by landlord at our expense || | ||
|- | |- | ||
| unit 24 -- remove doorbot and patch hole with wood, then fill edges with wood filler (brown stuff). This should be done as late as possible, but you can make the wood patch by taking | | unit 24 -- remove doorbot card reader and patch hole with wood, then fill edges with wood filler (brown stuff). This should be done as late as possible, but you can make the wood patch by taking reader out temporarily, and only put it in as the last step. || | ||
|- | |||
| Remove CISA release lock from door to unit 24, remove doorbot and bell from wall above the meter || | |||
|- | |||
| Paint remaining parts of the wall around meter and behind old payphone and where the wall has been filled at the back of the quiet room || | |||
|} | |} | ||
Line 120: | Line 125: | ||
{| class="wikitable" | {| class="wikitable" | ||
|+ Supplies still needed | |+ Supplies still needed | ||
|- | |- | ||
| door spindle (square rod) and 2 handles - i've got 1 handle and sq. rod from the old space || hardware store | | door spindle (square rod) and 2 handles - i've got 1 handle and sq. rod from the old space || hardware store | ||
|- | |- | ||
| panel pins for door stop || hardware store | | panel pins for door stop || hardware store | ||
|} | |} | ||