146
edits
m (AlisonW moved page 447 Hackney Road /Power works list to Power/works list: We're now here, so drop the superfluous bit (and use of sub-pages)) |
(re-cat) |
||
| Line 30: | Line 30: | ||
*** Ring should be wired on alternate boxes for preference. Ensure earth sleeving is used, especially on short earth leads to boxes. | *** Ring should be wired on alternate boxes for preference. Ensure earth sleeving is used, especially on short earth leads to boxes. | ||
[[Category:Infrastructure | [[Category:Infrastructure]] | ||