Anonymous

Power/works list: Difference between revisions

From London Hackspace Wiki
re-cat
m (AlisonW moved page 447 Hackney Road /Power works list to Power/works list: We're now here, so drop the superfluous bit (and use of sub-pages))
(re-cat)
Line 30: Line 30:
*** Ring should be wired on alternate boxes for preference. Ensure earth sleeving is used, especially on short earth leads to boxes.
*** Ring should be wired on alternate boxes for preference. Ensure earth sleeving is used, especially on short earth leads to boxes.


[[Category:447_Hackney]]
 
[[Category:Infrastructure/Electrics]]
[[Category:Infrastructure]]