607
edits
No edit summary |
|||
| Line 11: | Line 11: | ||
* Making [[Project:Mast_Trailer|mast trailer]] operational (can extend to 30m, so easily tops local buildings) | * Making [[Project:Mast_Trailer|mast trailer]] operational (can extend to 30m, so easily tops local buildings) | ||
** Remove paint/rust | ** Remove paint/rust | ||
** Antirust treatment | ** Antirust treatment and painting | ||
** Fix wobble in left-hand wheel | |||
** Get engine and compressor working | |||
** Check pneumatic system for leaks | |||
** Strip down mast, grease and reseal | |||
* Steerable antenna | * Steerable antenna | ||
* Control software for steerable antenna | * Control software for steerable antenna | ||