496
edits
| Line 7: | Line 7: | ||
Brakes need inspected. <br/> | Brakes need inspected. <br/> | ||
Left side Hub needs looking at (after the wheel fell off during transit) | Left side Hub needs looking at (after the wheel fell off during transit) | ||
=== Chassis === | |||
Wheel arches have been removed. These need measured and remade. <br/> | |||
2/3 of the chassis has been ground down to bare metal and painted. The last 1/3 needs ground down and painted. <br/> | |||
It all needs another coat or two. | |||
=== Electrics === | |||
Trailer electrics need redone: New lights, new cable, new plug. This will be done when the main chassis is complete. <br/> | |||
=== Mast === | |||
Mast needs stripped down and cleaned and regressed and the new seals fitted and the whole thing put back together again. <br/> | |||
We need to take measurements (tgreer to confirm which ones), so we can order the new seals. <br/> | |||
Need to paint the mast once we're putting it back together. | |||
=== Compressor/Engine === | |||
Box needs scraped/painted. <br/> | |||
Engine needs looked at and made to run again. <br/> | |||
Compressor we believe is fine but we might want to check. <br/> | |||
Control valve needs checked to ensure it's ok before it's mounted back on the chassis. | |||
== Training Courses == | == Training Courses == | ||