934
edits
| Line 17: | Line 17: | ||
PDF version of the darkroom layout proposal: [[File:Darkroom_Proposal.pdf]] | PDF version of the darkroom layout proposal: [[File:Darkroom_Proposal.pdf]] | ||
So far, the plumbing is ready. There are some small sinks but ideally we will like to get an industrial one with shower or around 1.5 meters long ( 100 pounds second hand) | So far, the plumbing is ready. There are some small sinks but ideally we will like to get an industrial one with shower or around 1.5 meters long ( 100 pounds second hand)<br> | ||
Sink Update: Sat 10th Jan 2015 We acquired a proper darkroom 3-section sink File:Darkroom-sink-overview.jpg | Sink Update: Sat 10th Jan 2015 We acquired a proper darkroom 3-section sink (see pic) <br> | ||
[[File:Darkroom-sink-overview.jpg|200px|thumb|The Sink]] | |||
There is need to build up a wall that divides it from the etching and dry area and isolates it from the dust and other workshop facilities. | There is need to build up a wall that divides it from the etching and dry area and isolates it from the dust and other workshop facilities. | ||
As well there is a need to build the wall and set up a curtain as its sketched in the map. | As well there is a need to build the wall and set up a curtain as its sketched in the map. | ||