Anonymous

Equipment/High Vacuum Station: Difference between revisions

From London Hackspace Wiki
no edit summary
m (Updating photo)
No edit summary
Line 180: Line 180:


Inline temperature sensor, flow-sensor, pumps, etc.. all available from PC water-cooling suppliers.
Inline temperature sensor, flow-sensor, pumps, etc.. all available from PC water-cooling suppliers.
'''''13-05-2015'''''
The implosion-sheild is done. This is both to protect users in the case of catastrophic failure of the glass bell-jar, and protect the bell-jar from users and passers-by in the mixed usage workshop.
The bell-jar will be padlocked down as an access-control measure.
We're still in need of vacuum gauges, feedthrus and vacuum hose to connect the backing pump. Getting close now!


[[Category:Projects]]
[[Category:Projects]]