Anonymous

Project:Clark Trailer Mast: Difference between revisions

From London Hackspace Wiki
→‎Work Required: updated Sep 2015 stuff
(Added mast being erected to project page)
(→‎Work Required: updated Sep 2015 stuff)
Line 80: Line 80:
== Work Required ==
== Work Required ==
[[File:m0hsl-mast.jpg|400px|thumb|right|Amateur Radio Club hacking on the Antenna Mast into the Dark Hours of the Winter Night]]
[[File:m0hsl-mast.jpg|400px|thumb|right|Amateur Radio Club hacking on the Antenna Mast into the Dark Hours of the Winter Night]]
(This is in some sort of vague order)
'''Updated Sep 2015'''
 
''Things to procure''
* Need proper pressure gauge (new one was wrong fitting)
* Need pneumatic bits
** hoses
** connectors
** electric compressor
* Need ladder
* Need more paint
* Need mast-turning handles (wood brittle)
* Need jack handle (missing wood)
* Buy some WD-40?
* Buy trailer electrics
* Buy a post-level (bubble indicator)
* Buy LED strips and Swarovski crystals for decorations
* Buy 30 meters of feeder cable (UHF and HF feeders)
 
''Things to do''
* Painting the remaining blue bits
* Cleaning and refitting the collars
* Lubricate the moving parts (legs, axels, screw threads, etc)
* Mount the wheel arches
* Refurbish the guy rope box
* Repair/remount the engine box hinges
* Sort through the plastic gubbins box
* Review road-worthiness (including the following but not limited to:)
** Brakes
** Wheel hubs
** Tightness of bolts
* run cable between mast top (fully erect) and shack
 
'''Pre-existing To-Do Items'''


* Strip existing paint and rust
* Strip existing paint and rust