75
edits
No edit summary |
No edit summary |
||
| Line 64: | Line 64: | ||
== Needed == | == Needed == | ||
* | * Coolant / chip removal system - those chips build up fast! Either a suds pump or (quiet?) compressor/non fogging mist will be needed as the interlock prevents manual removal of chips during a program. | ||
* ER type collect can be had from Gloster Tooling a price has not been obtained yet the, model is EC EM16 035 on page 8 @ http://www.glostertooling.co.uk/backup/download/Engineers%20tool%20catalogue.pdf | * ER type collect can be had from Gloster Tooling a price has not been obtained yet the, model is EC EM16 035 on page 8 @ http://www.glostertooling.co.uk/backup/download/Engineers%20tool%20catalogue.pdf | ||
| Line 75: | Line 75: | ||
* The cutter appears to spin off-centre | * The cutter appears to spin off-centre | ||
** When slotting in the collet make sure to put it the right way in as it's got a notch which will only go in fully when aligned | ** When slotting in the collet make sure to put it the right way in as it's got a notch which will only go in fully when aligned | ||
== Training == | |||
The system is currently in an "beta" state. If you would like to get trained to do a specific job you have in mind, on the understanding that you may find issues along the way (which helps us too!) you can email the Robotics mailing list to arrange a time for training. You will find this easiest if you take a look at one of the recommended packages above (or your own choice of package, we will try to accomodate). | |||
edits