691
edits
(Update for EX2) |
mNo edit summary |
||
| Line 3: | Line 3: | ||
A ventilation system (fresh air supply and extract) is currently under construction at EX2 | A ventilation system (fresh air supply and extract) is currently under construction at EX2 | ||
The blower units are [https://www.heliosventilatoren.de/en/products/round-duct-fans/silentbox/en-sb-250-c-09512 Helios; SB 250 C] | The blower units are [https://www.heliosventilatoren.de/en/products/round-duct-fans/silentbox/en-sb-250-c-09512 Helios; SB 250 C], with a free-blowing supply rate of 960 m³/h | ||