Hackspace Move/Renovation: Difference between revisions
From London Hackspace Wiki
No edit summary |
No edit summary |
||
Line 27: | Line 27: | ||
*Supplies | *Supplies | ||
==Disability considerations== | |||
* Disabled toilet (Mobility bars, light switch) | * Disabled toilet (Mobility bars, light switch) |
Revision as of 13:13, 6 February 2013
This page is for planning the build out of our new space, currently centred on 445 Hackney Road.
Please note, this is for planning on bringing up a new space to the level we currently enjoy, not new things. (that can come after) This is so that we have a action and cost plan to maintain the level of our current space.
Basement
- Extraction for individual tools and room dust.
- Power distribution to the center of the room etc
- Moar network sockets around room (ACnode)
- Look at flooring situation
Ground Floor
- Moar network
- Mid room power
- Electric release on the rear door
- Building of classroom
- Draft proof louver windows
Car Park
- Member access for car parking and bike storage
Facilities
Storage
- Members boxes
- Rarely-used equipment
- Supplies
Disability considerations
- Disabled toilet (Mobility bars, light switch)
- Low light switches (ask Sparky to certify?)
- Entrance ramp
- Lower door laser
Total Costing
The above will cost approximately - £xxx