Hackspace Move/Electronics: Difference between revisions

From London Hackspace Wiki
No edit summary
Line 8: Line 8:
== Etching station ==
== Etching station ==


The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs near the biolab.
The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft.

Revision as of 22:16, 24 March 2013

Electronics stations

Responsible: mentar

The plan is to have 2 soldering and 1 test bench upstairs


Etching station

The etch tank needs ventilation, running water and drainage, hence the plan is to locate it downstairs between the biolab and the lift shaft.